
C122-E001-10EN
C-9
C.1 Power-On/Off Procedures for the Main Unit
C.1.2
Power-on and power-off procedures for the entire system
C.1.2.1 Power-on procedure for the entire system
Remarks: The procedures described below show sample screenshots of windows
displayed for the PRIMEQUEST 580A/540A/580/540/480/440.
Procedure
1
Switch on the power switches on the MMB and peripherals.
2
Log in to MMB Web-UI.
The MMB Web-UI window is displayed.
3
Click [System]
→
[System Power Control] from the MMB menu.
The [System Power Control] window is displayed.
Figure C.5 [System Power Control] window
4
Click [Power On all partition(s)] or [Power On the Chassis only] (only for the
PRIMEQUEST 580A/540A/580/540/480/440), and click the [Apply] button.
System power is turned on.
Remarks: If [Power On all partition(s)] is selected while only cabinet power is
on, power to every partition is turned on.
If [Power On the Chassis only] is selected, power to components
other than the system board (SB) and IO Unit is turned on (this
includes power to the GSWB).
Summary of Contents for PRIMEQUEST 400 Series
Page 1: ...C122 E001 10EN Front Cover INSTALLATION MANUAL ...
Page 2: ......
Page 18: ...x C122 E001 10EN NOTE ON SAFETY Extended Power Cabinet ...
Page 19: ...C122 E001 10EN xi NOTE ON SAFETY Extended I O Cabinet ...
Page 20: ...xii C122 E001 10EN NOTE ON SAFETY PCI_Box ...
Page 21: ...C122 E001 10EN xiii NOTE ON SAFETY PRIMEQUEST 520A 520 420 Main unit ...
Page 22: ......
Page 24: ......
Page 42: ......
Page 46: ......
Page 122: ......
Page 186: ......
Page 354: ......
Page 356: ......
Page 394: ......
Page 428: ......
Page 445: ......
Page 446: ...Back Cover ...