
4-72
C122-E001-10EN
CHAPTER 4 Work Required After Operating System Installation
5
A list of network adapters is displayed for teaming.
Select [Intel(R) PRO/100 VE Network Connection] and [Intel(R) Pro/100 M
Network Connection] check boxes, and click the [Next] button.
Figure 4.18 List of network adapters
6
Select [Adapter Fault Tolerance] from the mode list, and click the [Next] button.
Figure 4.19 List of team mode
Summary of Contents for PRIMEQUEST 400 Series
Page 1: ...C122 E001 10EN Front Cover INSTALLATION MANUAL ...
Page 2: ......
Page 18: ...x C122 E001 10EN NOTE ON SAFETY Extended Power Cabinet ...
Page 19: ...C122 E001 10EN xi NOTE ON SAFETY Extended I O Cabinet ...
Page 20: ...xii C122 E001 10EN NOTE ON SAFETY PCI_Box ...
Page 21: ...C122 E001 10EN xiii NOTE ON SAFETY PRIMEQUEST 520A 520 420 Main unit ...
Page 22: ......
Page 24: ......
Page 42: ......
Page 46: ......
Page 122: ......
Page 186: ......
Page 354: ......
Page 356: ......
Page 394: ......
Page 428: ......
Page 445: ......
Page 446: ...Back Cover ...