XSCF>
showhardconf
:
XBBOX#80
Status:Normal;
Role:Master;
Ver:2038h;
Serial:2111206001;
:
XSCF>
switchscf
-y
-t
Standby
Note
-
Although
error
logs
for
the
crossbar
box
to
be
replaced
are
registered
when
the
input
power
supply
is
disconnected,
ignore
all
of
them.
XSCF>
diagxbu
-y
-b
XX
-t
YY
-t
ZZ
Restrictions
on
replacing
crossbar
box
Replacement
of
a
crossbar
box
using
the
replacefru(8)
command
is
not
supported
at
present.
To
replace
a
crossbar
box,
perform
the
following
procedure:
1.
Execute
the
showhardconf
command
to
confirm
that
the
crossbar
box
to
be
replaced
is
not
the
master
chassis.
The
crossbar
box
indicated
as
"Role:Master"
is
the
master
chassis.
2.
If
the
crossbar
box
to
be
replaced
is
the
master
chassis,
execute
the
switchscf
command
to
switch
it
to
standby.
3.
The
master
XSCF
is
switched.
Log
in
to
the
XSCF
again.
4.
Power
off
the
physical
partition
(PPAR)
that
uses
the
crossbar
box,
and
then
power
off
the
crossbar
box
to
be
replaced.
Confirm
that
the
Power-LED
on
the
operation
panel
of
the
crossbar
box
is
turned
off.
5.
Disconnect
the
input
power
supply
to
the
crossbar
box
to
be
replaced,
and
replace
it.
6.
Connect
the
power
cord
of
the
crossbar
box
to
the
input
power
supply.
For
details,
see
"5.4
Connecting
Cable
to
Crossbar
Box"
in
the
Fujitsu
M10/SPARC
M10
Systems
Installation
Guide
.
Wait
until
STANDBY-LED
on
the
operation
panel
of
the
crossbar
box
turns
on.
7.
Execute
the
diagxbu
command
to
perform
diagnosis
of
the
newly
installed
crossbar
box.
Specify
the
BB_IDs
(00
to
15)
of
SPARC
M10-4S
that
is
powered
off
in
XX,
YY,
and
ZZ.
8.
Execute
the
showlogs
command
to
confirm
that
no
error
occurred
during
the
diagnosis.
Fujitsu
M10/SPARC
M10
Systems
Product
Notes
for
XCP
Version
2240
・
March
2015
184
Summary of Contents for M10 Series
Page 8: ...Fujitsu M10 SPARC M10 Systems Product Notes for XCP Version 2240 March 2015 viii ...
Page 14: ...Fujitsu M10 SPARC M10 Systems Product Notes for XCP Version 2240 March 2015 xiv ...
Page 24: ...Fujitsu M10 SPARC M10 Systems Product Notes for XCP Version 2240 March 2015 10 ...
Page 192: ...Fujitsu M10 SPARC M10 Systems Product Notes for XCP Version 2240 March 2015 178 ...
Page 200: ...Fujitsu M10 SPARC M10 Systems Product Notes for XCP Version 2240 March 2015 186 ...