Chapter 4
Practical Examples of DR
4-5
4.1.4
Flow: Replacing a System Board
FIGURE 4-4
Flow: Replacing a System Board
Deletion reservation
operation for the system
board in its domain
Checking operation and selecting a DR operation
Deletion reservation
Deletion
DR
Power-off of
Hardware replacement
Stop status
Stop status
Pooled
There is a domain for
There is no
Checking operation and selecting a DR operation
Addition reservation
DR addition
Power-on of the
Start of
State of the domain
- Operation status and configuration of a domain
- Configuration of the system board to be replaced
- Checking the device status
of the
system
reservation
deletion
operation for the system
board in its domain
Deletion operation for
its domain
the system board in
of the domain
the relevant domain
which deletion has
been reserved.
domain for
which deletion
has been
reserved.
Deletion operation for
in its domain
the system board
domain
Start of
domain
relevant domain
in operation
board
domain
- Adjustment between other domains
Summary of Contents for SPARC Enterprise M4000
Page 2: ......
Page 6: ......
Page 23: ...Preface xxi Reader s Comment Form ...
Page 90: ...3 28 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 116: ...4 26 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 152: ...A 36 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 158: ...Glossary 4 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 161: ......