70
U41169-J-Z156-4-74
Unpacking the Storage Subsystem
Installation
11.2
Unpacking the Storage Subsystem
V
CAUTION!
Please note the safety instructions in
Enlist the help of others to carry the storage subsystem.
You should retain the original packing of the storage subsystem for possible
further transport.
Ê
Unpack all parts.
Ê
Check the contents of the package for visible transport damage.
Ê
Check whether the delivery matches the information given on the delivery
note.
Ê
Check whether the first page of the guarantee booklet has been completed
in full.
If you find transport damage or inconsistencies between the contents of the
package and the delivery note, inform your supplier immediately!
11.3
Setting Up the Floorstand Model
Set up the storage subsystem at the intended installation site.
Note the following:
–
The equipment must be protected against direct sunlight.
–
The required minimum distances for operating and maintenance areas must
be adhered to.
–
In order to connect the server, the rear panel of the storage subsystem must
be accessible.
–
The mains plug must be accessible easily and safely.
–
The free space in front of and behind the storage subsystem must be at least
200 mm so that the storage subsystem is ventilated sufficiently.