![FSA H1-EQ5AN Manual Download Page 4](http://html1.mh-extra.com/html/fsa/h1-eq5an/h1-eq5an_manual_2340854004.webp)
Page
4
of
10
V. Storage Tank Assembly
1. Using standard white plumbers’ tape – wrap the stainless-steel port (top of tank) with 6 – 8 even
rounds of tape.
2. Install the 90° Tank Valve Elbow firmly
NOTE: At no point should you need to tamper with the air valve on the tank during new installation –
these tanks are pre-set to ~7psi (while empty). This is a bladder tank and the water will go in/out of
the tank on the same water line.
Connecting the RO System
I. Fittings
On the back of the unit you will find the connection points. If required,
there are 4x Stem elbow fittings you can install into these ports to
provide better angle for tubing installation.
II. Tubing
It is best to allow enough excess tubing to be able to easily move the system out from the cupboard
when maintenance is required.
Measure a length of white tubing (Inlet Tubing) to be installed between the FWA and the ‘Inlet’ port on the
filter system. Cut using tube cutters. When connecting to the system refer to the ‘Quick Connect Fitting’
Instructions. To connect to the FWA, unscrew the lock nut until it hits a stop end. Push the tubing in firmly