Delay
delay
charge start delay
-
Delay time (minutes) between the activation time of the charge start and the
actual charge start.
charge end delay
-
Delay time (minutes) between the signaled end of charge (e.g. green indicat-
or) and the actual end of charge.
at mains failure restart charging
-
If this option is activated, the charging process is automatically restarted
after a fault in the electrical network as soon as the electrical network is
available again.
at mains failure
-
Restart charging
-
Automatic/continue charging
If the "Restart charging" option is activated, the charging process is automatic-
ally restarted after a fault in the electrical network as soon as the electrical net-
work is available again.
If the "Automatic/continue charging" option is activated, the charging process is
automatically continued after a fault in the electrical network as soon as the
electrical network is available again.
Calendar
calendar
The calendar function enables charging to be started automatically according to
the following criteria:
-
Time window within which charging should not be started when a battery is
connected.
-
Time window within which a defined curve 1 should be started when a bat-
tery is connected.
-
Time window within which a defined curve 2 should be started when a battery
is connected.
1
To activate the calendar function,
select and confirm the "ON" set-
ting.
"Charging settings" menu item:
-
Type of battery for all curves:
e.g. Pb-WET.
-
Curve settings when the corres-
ponding curve is selected.
Further settings are possible within the calendar function:
43