All-pin separation cabling variant, e.g. Germany,
France, Spain, UK
Functions
-
Measuring and transferring the required parameters for energy management
and Solar.web by the Fronius Smart Meter.
-
Disconnecting from the public grid to enable operation in backup power
mode if the grid parameters are outside the country-specific standards.
-
Reconnecting to the public grid when the grid parameters are within the lim-
its specified by the country-specific standards.
-
Establishing a proper ground connection for backup power mode to ensure
the protection devices function correctly.
-
Option of having a separate backup power circuit or several backup power
circuits that are supplied even during failure of the public grid. The total load
of the backup power circuits must not exceed the nominal output of the in-
verter. Furthermore, the performance of the connected battery must also be
considered.
Transitioning
from feeding en-
ergy into the grid
to backup power
mode
1
.
The public grid is monitored by the inverter's internal grid and system pro-
tection unit and by the Fronius Smart Meter connected to it.
2
.
Failure of the public grid
.
3
.
The inverter carries out the necessary measures according to the country
standard and then switches off.
Contactors K1, K2 (K2 - optional in France and Spain), K4 and K5 drop out.
This disconnects the backup power circuits and the inverter from the rest of
the home network and from the public grid, as the main contacts of the con-
tactors K1 and K2 open at all pins. The NC auxiliary contacts of contactors
K1 and K2 send feedback to the inverter that the contactors are open (a con-
dition for starting backup power mode).
4
.
The NC main contacts of contactors K4 and K5 are closed, establishing a
connection between the neutral conductor and the ground conductor. The
two other NC main contacts of contactors K4 and K5 give feedback to the
inverter that the ground connection has been established correctly (a condi-
tion for starting backup power mode).
5
.
The inverter activates relay K3, which interrupts the supply to contactors K1,
K2, K4 and K5. This prevents unintentional activation of contactors K1, K2,
K4 and K5 and thus a grid connection when voltage is restored in the grid.
6
.
The NO contact of relay K3 gives additional feedback to the inverter on
whether the locking was successfully performed by relay K3.
7
.
The inverter decides based on the contactor's feedback as well as the meas-
urements on the inverter terminals and the Smart Meter that the emergency
power mode can be activated.
8
.
After all the required activation tests have been carried out, the inverter
starts backup power mode.
9
.
All loads in the backup power circuits are supplied with power. The remaining
loads are not supplied with power and are safely isolated.
44
Summary of Contents for Primo GEN24 3.0
Page 2: ......
Page 12: ...12...
Page 13: ...General information 13...
Page 14: ...14...
Page 34: ...34...
Page 35: ...Backup power variant PV Point OP 35...
Page 36: ...36...
Page 38: ...38...
Page 39: ...Backup power variant Full Backup 39...
Page 40: ...40...
Page 48: ...48...
Page 49: ...Installation 49...
Page 50: ...50...
Page 57: ...Do not install the inverter on the ceiling 57 EN...
Page 101: ...Settings user interface of the in verter 101...
Page 102: ...102...
Page 132: ...132...
Page 133: ...Options 133...
Page 134: ...134...
Page 144: ...144...
Page 145: ...Appendix 145...
Page 146: ...146...
Page 172: ...172...
Page 173: ...Circuit diagrams 173...
Page 174: ...174...
Page 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Page 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Page 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Page 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Page 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Page 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Page 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Page 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Page 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Page 187: ...Dimensions of the inverter 187...
Page 188: ...188...
Page 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Page 190: ...190...
Page 191: ...191 EN...
Page 192: ......