Cabling variants including backup power circuits
with 1-pin separation e.g. Austria or Australia
Functions
-
Measuring and transferring the required parameters for energy management
and Solar.web by the Fronius Smart Meter.
-
Disconnecting from the public grid to enable operation in backup power
mode if the grid parameters are outside the country-specific standards.
-
Reconnecting to the public grid when the grid parameters are within the lim-
its specified by the country-specific standards.
-
Option of having a separate backup power circuit or several backup power
circuits that are supplied even during failure of the public grid. The total load
of the backup power circuits must not exceed the nominal output of the in-
verter. Furthermore, the performance of the connected battery must also be
considered.
Transitioning
from feeding en-
ergy into the grid
to backup power
mode
1
.
The public grid is monitored by the inverter's internal grid and system pro-
tection unit and by the Fronius Smart Meter connected to it.
2
.
Failure of the public grid
.
3
.
The inverter carries out the necessary measures according to the country
standard and then switches off.
Contactors K1 and K2 (K2 - optional in Australia) drop out. This disconnects
the backup power circuits and the inverter from the rest of the home net-
work and from the public grid, as the main contacts of the contactors K1 and
K2 1-pin open. The inverter activates relay K3, which interrupts the supply to
contactors K1 and K2. This prevents unintentional activation of contactors
K1 and K2 and thus a grid connection when voltage is restored in the grid.
The NC auxiliary contacts of contactors K1 and K2 send feedback to the in-
verter that the contactors are open (a condition for starting backup power
mode).
4
.
The NO contact of relay K3 gives additional feedback to the inverter on
whether the locking was successfully performed by relay K3.
5
.
The inverter decides based on the contactors' feedback as well as the meas-
urements on the inverter terminals and the Smart Meter that backup power
mode can be started.
6
.
After all the required activation tests have been carried out, the inverter
starts backup power mode.
7
.
All loads in the backup power circuits are supplied with power. The remaining
loads are not supplied with power and are safely isolated.
Transitioning
from backup
power mode to
feeding energy
into the grid
1
.
The inverter is operating in backup power mode. The contactors K1 and K2 to
the public grid are open.
2
.
Public grid available again.
3
.
The Fronius Smart Meter monitors the grid parameters on the public grid
and passes this information to the inverter.
4
.
The stability of the returned public grid is determined by checking the meas-
ured values of the Fronius Smart Meter.
5
.
The inverter ends backup power mode and disconnects the outputs.
6
.
The inverter deactivates K3. The contactors K1 and K2 are reactivated.
7
.
All circuits are reconnected to the public grid and are supplied by the grid.
The inverter does not feed anything into the grid at this time.
8
.
The inverter can start feeding energy into the grid again after performing the
grid checks required by the relevant standard.
43
EN
Summary of Contents for Primo GEN24 3.0
Page 2: ......
Page 12: ...12...
Page 13: ...General information 13...
Page 14: ...14...
Page 34: ...34...
Page 35: ...Backup power variant PV Point OP 35...
Page 36: ...36...
Page 38: ...38...
Page 39: ...Backup power variant Full Backup 39...
Page 40: ...40...
Page 48: ...48...
Page 49: ...Installation 49...
Page 50: ...50...
Page 57: ...Do not install the inverter on the ceiling 57 EN...
Page 101: ...Settings user interface of the in verter 101...
Page 102: ...102...
Page 132: ...132...
Page 133: ...Options 133...
Page 134: ...134...
Page 144: ...144...
Page 145: ...Appendix 145...
Page 146: ...146...
Page 172: ...172...
Page 173: ...Circuit diagrams 173...
Page 174: ...174...
Page 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Page 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Page 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Page 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Page 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Page 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Page 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Page 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Page 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Page 187: ...Dimensions of the inverter 187...
Page 188: ...188...
Page 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Page 190: ...190...
Page 191: ...191 EN...
Page 192: ......