I/O power man-
agement set-
tings - 1 relay
DNO Rules
V+/GND
IO
I
not used
DNO Feedback
Rule 1
0
2
4
6
8
10
1
3
5
7
9
11
100
DNO Feedback
Active Power
1
cap
Power Factor (cos φ)
Rule 2
0
2
4
6
8
10
1
3
5
7
9
11
0
DNO Feedback
Active Power
1
cap
Power Factor (cos φ)
EXPORT
IMPORT
0
0
2
3
4
5
6
7
8
9
10
11
1
2
4
1
3
5
6
9
11
7
10
8
v
+
v
+
GND
GND
I/O Power Management
None
None
None
None
None
None
None
None
IO control
None
None
None
Autotest
(CEI 0-21)
Description
The "Autotest" can be used to check the protection function required by Italian
standards for monitoring the voltage and frequency limit values of the inverter
during commissioning. In normal operation, the inverter constantly checks the
current voltage and frequency actual value of the grid.
After starting the autotest, various individual tests run automatically one after
the other. Depending on network conditions, the duration of the test is about 15
minutes.
IMPORTANT!
The inverter may only be commissioned in Italy after an autotest has been suc-
cessfully performed (CEI 0-21). If the autotest is not passed, feeding energy into
the grid is not permitted. Once the autotest is started, it must be completed suc-
cessfully. The autotest cannot be started during backup power operation.
U max
Test for checking the maximum voltage in phase conductors
U min
Test for checking the minimum voltage in phase conductors
f max
Test for checking the maximum grid frequency
f min
Test for checking the minimum grid frequency
f max alt
Test for checking an alternative maximum grid frequency
130
Summary of Contents for Primo GEN24 3.0
Page 2: ......
Page 12: ...12...
Page 13: ...General information 13...
Page 14: ...14...
Page 34: ...34...
Page 35: ...Backup power variant PV Point OP 35...
Page 36: ...36...
Page 38: ...38...
Page 39: ...Backup power variant Full Backup 39...
Page 40: ...40...
Page 48: ...48...
Page 49: ...Installation 49...
Page 50: ...50...
Page 57: ...Do not install the inverter on the ceiling 57 EN...
Page 101: ...Settings user interface of the in verter 101...
Page 102: ...102...
Page 132: ...132...
Page 133: ...Options 133...
Page 134: ...134...
Page 144: ...144...
Page 145: ...Appendix 145...
Page 146: ...146...
Page 172: ...172...
Page 173: ...Circuit diagrams 173...
Page 174: ...174...
Page 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Page 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Page 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Page 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Page 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Page 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Page 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Page 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Page 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Page 187: ...Dimensions of the inverter 187...
Page 188: ...188...
Page 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Page 190: ...190...
Page 191: ...191 EN...
Page 192: ......