![Fronius Primo GEN24 3.0 Operating Instructions Manual Download Page 106](http://html1.mh-extra.com/html/fronius/primo-gen24-3-0/primo-gen24-3-0_operating-instructions-manual_2339204106.webp)
Mode
Description
Information
DRM pin
I/O
pin
DRM5
Export P
nom
≤ 0%
without disconnec-
tion from the grid
currently not supported
DRM 1/5
IN6
DRM6
Export P
nom
≤ 50%
currently not supported
DRM 2/6
IN7
DRM7
Export P
nom
≤ 75% &
-Q
rel
* ≥ 0%
currently not supported
DRM 3/7
IN8
DRM8
Export P
nom
≤ 100%
currently not supported
DRM 4/8
IN9
The percentages always refer to the nominal device output.
IMPORTANT!
If the Demand Response Mode (DRM) function is enabled and no DRM control is
connected, the inverter switches to Standby mode.
Demand Re-
sponse Modes
(DRM)
Here you can enter a value for the apparent power input and the apparent power
output for the Australia country setup.
Inverter
"Enforce Standby"
When the function is activated, the feed-in mode of the inverter is interrupted.
This enables a powerless shutdown of the inverter and protects its components.
When the inverter is restarted, the standby function is automatically deactivated.
"PV 1"
and
"PV 2"
Parameter
Range of val-
ues
Description
"Mode"
Off
The MPP tracker is deactivated.
Auto
The inverter uses the voltage at which the
max. possible power of the MPP tracker is
possible.
Fix
The MPP tracker uses the voltage defined
in the "UDC fix".
"UDC fix"
80
‑
530 V
The inverter uses the fixed preset voltage
used at the MPP tracker.
"Dynamic Peak
Manager"
Off
The function is deactivated.
On
The entire solar module string is checked
for optimisation potential and determines
the best possible voltage for feed-in mode.
"Ripple Control"
Ripple control signals are signals sent out by the energy company to switch con-
trollable loads on and off. Depending on the installation situation, ripple control
106
Summary of Contents for Primo GEN24 3.0
Page 2: ......
Page 12: ...12...
Page 13: ...General information 13...
Page 14: ...14...
Page 34: ...34...
Page 35: ...Backup power variant PV Point OP 35...
Page 36: ...36...
Page 38: ...38...
Page 39: ...Backup power variant Full Backup 39...
Page 40: ...40...
Page 48: ...48...
Page 49: ...Installation 49...
Page 50: ...50...
Page 57: ...Do not install the inverter on the ceiling 57 EN...
Page 101: ...Settings user interface of the in verter 101...
Page 102: ...102...
Page 132: ...132...
Page 133: ...Options 133...
Page 134: ...134...
Page 144: ...144...
Page 145: ...Appendix 145...
Page 146: ...146...
Page 172: ...172...
Page 173: ...Circuit diagrams 173...
Page 174: ...174...
Page 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Page 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Page 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Page 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Page 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Page 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Page 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Page 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Page 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Page 187: ...Dimensions of the inverter 187...
Page 188: ...188...
Page 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Page 190: ...190...
Page 191: ...191 EN...
Page 192: ......