Please note the following criteria when choosing a location for the inverter:
Choosing a Loca-
tion for Inside In-
stallation
It should only be installed on a stable, vertical wall
Max. ambient temperatures: -20 °C / +55 °C
Relative humidity: 0 - 95 %
For use at altitudes above sea level: up to 2000 m
-
There should be a 200 mm (7.8 in) clearance on both sides of the inverter for the cool
air vents.
-
Maintain a side distance of 300 mm (11.8 in) between individual inverters.
The air flow direction within the inverter is from right to left (cold air intake on right, hot air
exit on left).
When installing the inverter in a switch panel cabinet (or similar closed environment), it is
necessary to make sure that the hot air that develops will be discharged by forced venti-
lation.
The inverter is designed for installation both indoors and outdoors.
50 mm
300 mm
200 mm
During certain operation phases the inverter may produce a slight noise. For this reason
it should not be installed in an occupied living area.
Do not install the inverter in:
-
areas with large amounts of dust
-
areas with large amounts of conducting dust particles (e.g., iron filings)
-
areas with corrosive gases, acids or salts
-
areas where there is an increased risk of accidents, e.g., from farm animals (horses,
cattle, sheep, pigs, etc.)
-
stables or adjoining areas
-
storage areas for hay, straw, chaff, animal feed, fertilizers, etc.
-
storage or processing areas for fruit, vegetables or winegrowing products
-
areas used in the preparation of grain, green fodder or animal feeds
-
greenhouses
Summary of Contents for IG Plus 100 V-1
Page 2: ...0...
Page 4: ...2...
Page 10: ...8...
Page 16: ...14...
Page 17: ...General Information...
Page 18: ......
Page 20: ...18 Safety symbols Risk of serious injury and damage due to incorrect operation...
Page 24: ...22...
Page 25: ...Installation and Startup...
Page 26: ......
Page 76: ...74 1 2 6 x 18...
Page 80: ...78 Closing Fronius IG Plus Closing Fronius IG Plus 1 1 3 2 1 1 2 3 2 4 1 3...
Page 89: ...Operation...
Page 90: ......
Page 126: ...124...
Page 127: ...Troubleshooting and Maintenance...
Page 128: ......
Page 146: ...144 Disconnect DC wire Disconnect AC wire 8 9...
Page 150: ...148...
Page 151: ...Appendix...
Page 152: ......
Page 164: ...162...
Page 165: ...163 g...
Page 167: ...165 g...