38
3
4
5
Commissioning
the cooling unit
NOTE!
Before starting up the cooling unit, first check that it contains an adequate amount
of coolant and that the coolant is clean and uncontaminated.
NOTE!
During welding, check at regular intervals that the coolant is flowing properly.
You should be able to see a steady return flow of coolant into the coolant container.
The cooling unit is powered from the power source. If the power source mains switch is
turned to position "I", the cooling unit will also start to operate.
3
2
max.
1
3
4
5
Summary of Contents for FK 5000
Page 2: ...2...
Page 4: ...4...
Page 18: ...18...
Page 19: ...General...
Page 20: ......
Page 25: ...Connections and mechanical compo nents...
Page 26: ......
Page 28: ...28...
Page 29: ...Installation and commissioning...
Page 30: ......
Page 35: ...35 EN 1 2 1 3 3 2 4 5 6 1 4...
Page 40: ...40...
Page 41: ...Troubleshooting...
Page 42: ......
Page 47: ...Care maintenance and disposal...
Page 48: ......
Page 56: ...56...
Page 57: ...Technical data...
Page 58: ......