![Fronius DeltaSpot Operating Instructions/Spare Parts List Download Page 27](http://html1.mh-extra.com/html/fronius/deltaspot/deltaspot_operating-instructions-spare-parts-list_2339381027.webp)
25
EN
EMERGENCY
STOP connection
diagram
If the EMERGENCY STOP function is controlled by an external 24 V signal (e.g. from the
robot control), then the external EMERGENCY STOP switch must be connected to pin
X2:B and X2:C (see illustration below).
If the EMERGENCY STOP function is controlled internally, then the internal EMERGENCY
STOP switch must be connected to pins X2:A and X2:B and pins X2:C and X2:D must also
be bundled.
B
24 V Emergency Stop feedback signal
C
+ 24 V output for initiating welding start-up
D
24 V feedback signal for welding start-up initiation
E
Prog. no. 0-1
F
Prog. no. 2-3
G
Prog. no. 4-7
H
Prog. no. 8-15
I
Prog. no. 16-31
J
Prog. no. 32-63
K
Prog. no. 64-127
L
Prog. no. 128-255
WARNING!
Incorrect operation may result in serious injury or damage. The de-
sign of external operating equipment or Emergency Stop actuators must com-
ply with valid national and international standards.
X6
Analogue power source connector
for connecting analogue power source signals
Assign-
ment
Colour
Connecting cable
A
Yellow
(+) pin secondary voltage, welding transformer
B
Green
(-) pin secondary voltage, welding transformer
C
White
(+) pin secondary current measurement (Rogowski coil)
D
Brown
(-) pin secondary current measurement (Rogowski coil)
E
Green/
yellow
Current measurement shield
F
Pink
(+) pin welding current set value (0 -10V)
G
Grey
(-) pin welding current set value (0 -10V)
X7
Reserve socket
X8-X 11 reserve
CAN1
communication interface to the PC
CAN2
communication interface to the DeltaSpot spot welding gun
F1
DeltaControl 24V supply fuse
3.15 A T
F2
DeltaSpot spot welding gun 24V supply fuse
1 A T
F3
Bus coupler 24V supply fuse
1 A T
F4
Welding voltage measurement fuse
1 A T
F5
Power supply fuse
10 A T
F6
48 V fuse
8 A F
Summary of Contents for DeltaSpot
Page 2: ...0...
Page 4: ...2...
Page 16: ...14...
Page 17: ...General information...
Page 18: ......
Page 22: ...20...
Page 23: ...Control elements and connections...
Page 24: ......
Page 36: ...34...
Page 37: ...Start up...
Page 38: ......
Page 47: ...45 EN 1 6 1 2 3 7 1 1 8 1 9 1 2 10 1 11 11...
Page 54: ...52...
Page 55: ...Spot welding...
Page 56: ......
Page 60: ...58...
Page 61: ...Troubleshooting and maintenance...
Page 62: ......
Page 71: ...69 EN 3 11 Nm 3 4 4 5 5 5 6 24 Nm 6...
Page 74: ...72 Disposal Dispose of in accordance with the applicable national and local regulations...
Page 77: ...Appendix...