![Fröling Lambdatronic SP 3200 Service Manual Download Page 42](http://html.mh-extra.com/html/froling-0/lambdatronic-sp-3200/lambdatronic-sp-3200_service-manual_2338762042.webp)
High temperature requirement because of DHW tank
loading
▪ NO: The heating circuit is operated according to the
selected heating curve.
▪ YES: The heating circuit is operated according to the
selected heating curve. Whilst the DHW tank is loading,
the heating circuit is operated at a higher temperature
for the duration of the DHW tank loading. Once the
DHW tank is loaded, the heating circuit is supplied
again according to the heating curve.
NOTICE! Parameters for “heating circuit 2” only!
For high temperature requirement don't look at DHW tank
1
▪ NO: DHW tank 1 is not supplied with heat from the lines
of heating circuit 2
▪ YES: DHW tank 1 is supplied with heat from the lines of
heating circuit 2 and requires a higher temperature for
the duration of the DHW tank loading.
4.1.5 Heating - Heating up program
System menu
Heating
Heating up program
Service
Heating up program active
▪ NO: Heating up program deactivated, all heating circuits
are operated according to the selected heating times.
▪ YES: The 30-day heating up program that has been set
starts. After the 30 days, the heating circuit that has
been selected operates based on the set heating times
again.
– The heating times of the selected heating circuit, as well
as the boiler/buffer tank loading times are automatically
set to 0:00-24:00 and the outside air temperature
heating limit is ignored.
– When using a firewood boiler, a corresponding heat
supply must be ensured.
– If the actual flow temperature setpoint required cannot
be reached or maintained (e.g. boiler output, …), then
no warning is displayed!
– In the event of a power failure, the program continues
from the point at which it was interrupted.
If the current room temperature falls below the set frost
protection temperature setpoint, this influences the set flow
temperature setpoint of the heating up program.
NOTE: Only in conjunction with remote control!
Current day of the heating up program
Shows the current day of the heating up program that is
running. By adjusting this parameter, you can jump
forward or return to a specific day of the program.
Which heating up program is used
There are set options for the progression of the flow
temperature in heating up programs 1 – 6. With heating up
program 7 the flow temperature can be selected freely
over the entire 30 days.
Heating up program 8 allows you to pre-define the
progression of the flow temperature for each individual
day.
Outfeed setpoint for all days in program 7
If heating up program 7 is active, the selected heating
circuit is adjusted to the specified flow temperature.
4
Parameters overview
Heating
42
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com