5.8 Adapting the electrostatic precipitator system (if required)
The following components of the electrostatic precipitator system can be installed on
the opposite side:
▪ Ash container
⇨ See "Modification of the ash container on the opposite side of the filter system"
[page 21]
▪ Bypass flap drive
⇨ See "Modification of the bypass flap drive on the opposite side" [page 27]
Electrostatic precipitator system EF 250
Electrostatic precipitator system EF 500
The flue pipe flanges can be mounted on all sides shown. As a general rule, the raw
gas inlet is always in the lower area, the clean gas outlet in the upper area. These
connections can be positioned according to the requirements and do not have to be
arranged one above the other.
NOTICE! If modification work is to be carried out, it is recommended that the filter is
not installed in the desired position until the work has been completed in order to have
sufficient all-round space.
The following modification work shows the necessary steps on an EF 250 electrostatic
precipitator system. Unless otherwise stated, all work on an EF 500 electrostatic
precipitator system must be carried out in the same way.
5
Assembly
Adapting the electrostatic precipitator system (if required)
20