Install a shut-off valve in the discharge line.
►
Design the suction lines to be as short as possible.
►
Install the suction lines in horizontal position or at a constant dropping angle towards
the pump unit. Rule out the possibility of air pockets and dips in the pipes.
►
Lay and connect the pipes to ensure that no stresses are applied to the connections.
►
Secure pipes to ceilings, walls, or floor using pipe clamps.
►
Align pipes flush with pump connections using a bracket.
6.6
Supply System Connection
The following connections are standardly provided on the suction and discharge sides in
DIN 11851 (milk pipe):
6.7
Hydraulic Connection
The hydraulic connection is adapted to machine size, project specifications, or customer re-
quirements (see order confirmation).
6.7.1
Suction-Side Connection
A slight pre-pressure is required on the suction side to ensure free inflow of the base medi-
um into the powder mixer. The hydrostatic pressure from the supply tank at a pressure of
approx. 0.05–0.5 bar (0.5–5.0 m suction head) is optimal here.
►
If required, use only a controlled pump on the suction side. It will not affect the suction
behavior of the powder mixer and will prevent fluid from being forced into the funnel.
6.7.2
Discharge-Side Connection
The back pressure from the powder mixer to the supply tank must be minimized. For this
reason, the discharge line cross section must be as large and the line length as short as pos-
sible. The standard version of the powder mixer can generate a maximum back pressure of
0.5–0.6 bar for optimum powder draw-in.
►
If additional components, e.g., heat exchangers or filters, that generate a significant pres-
sure loss are added to the circuit, the operator should install an additional pump down-
stream of the discharge-side connection on the powder mixer.
Model
Centrifugal Pump
Shear Pump
Connection
PM 01:
FZ 15
FSPE 712
DN 40
PM 02:
FZ 17
FSPE 3522
DN 50
PM 03:
FZ 20
FSPE 3532
DN 50
PM 04:
FZ 22
FSPE 3542
DN 65
PM 05:
FZ 25
FSPE 3552
DN 80
Table 5
Models and connections
Model
Displacement pump
Shear pump
Connection
PMV01
FL2 75 L3
FSPE 712
DN 40
PMV02
FL2 75 L3
FSPE 3522
DN 50
PMV03
FL2 75 L3
FSPE 3532
DN 50
PMV04
FL2 100 L3
FSPE 3542
DN 80
PMV05
FL2 100 L3
FSPE 3552
DN 100
Table 6
Designs and connections PMV
Summary of Contents for PM 01
Page 1: ...Original Instructions Powder Mixer PM Powder Mixer Size Powder Mixer No ...
Page 4: ... PM POWDER MIXER 4 ...
Page 35: ...35 ...
Page 36: ... PM POWDER MIXER 36 ...
Page 37: ...37 ...