INSTALLATION
Leak Check, Evacuation, and Charging (Triple Evacuation)
Friedrich requires all installations are Leak Checked and Evacuated in accordance to the “triple evacuation” process. This
process promotes a dry tight refrigeration system before opening the service valves. It recommended that a single port
refrigeration manifold and hoses rated over 800psi be used. Refrigeration hose valves, along with a vacuum pump and micron
gauge, must be used to ensure the system can be vacuumed and held under 500 microns. Check all equipment and hoses for
proper usage and leaks before beginning.
1. 1st Nitrogen Pressure Test:
Ensure all refrigeration connections are properly flared, secured, and torqued to their respective settings. Pres
surize the system with nitrogen to 550psi. Soap all connections with an approved refrigerant leak detection solu
tion. The pressure in the system must hold for one hour respective to the environmental conditions and should
not vary less than 540psi. If pressure can not be adequate held, check integrity of flares and torque specifications.
Once pressure is held adequately, purge the nitrogen charge to system pressure of 5-10psi. DO NOT RETURN TO
ATMOSPHERIC PRESSURE.
2. 1st Vacuum Micron Test:
Connect hoses and vacuum pump to the outdoor unit as shown in Fig.28. Start the vacuum pump and vacuum to 1000
microns. Close the valve to the vacuum pump and check for micron rise for 15 minutes. If microns rise to near atmo
spheric pressure, there is a potential leak; follow Section 8.7.A. If microns rise over 5000, the system is very wet and
will require further nitrogen purges.
3. 2nd Nitrogen Break:
Once the system holds below 5000 microns, reconnect the nitrogen tank break the system vacuum with 30-50psi of
nitrogen. Wait 5 minutes, then purge to 5-10psi. DO NOT RETURN TO ATMOSPHERIC PRESSURE.
4. 2nd Vacuum Micron Test:
Reconnect vacuum pump and gauge and begin evacuation. Vacuum system to 500 microns. Close vacuum valve
and check for micron rise. Vacuum should hold under 1000 microns. Repeat 8.7.C and 8.7.D until achieved.
5. 3rd Nitrogen Break:
Once the system holds below 1000 microns, reconnect the nitrogen tank break the system vacuum with 30-50psi of
nitrogen. Wait 5 minutes, then purge to 5-10psi. DO NOT RETURN TO ATMOSPHERIC PRESSURE.
6. 3rd Final Vacuum Micron Test:
Reconnect vacuum pump and gauge and begin evacuation. Vacuum system to 300 microns. Close vacuum valve
and check for micron rise. Vacuum should hold under 500 microns. Repeat 8.7.C and 8.7.D until achieved. Once held
under 500 microns, the system is considered dry and tight.
7. Charging the system:
Unscrew Service Valve Caps to expose the inner hexagon head. Use an allen-head spanner or service wrench with
appropriate adapter to release the refrigerant into the system. If the calculated line set length is over 24.9ft, weight
in the additional charge with an approved refrigerant scale as needed (Fig.28B).
Summary of Contents for MRM09Y1J
Page 8: ...8 INTRODUCTION MWM09Y1J MWM12Y1J Figure 101 Indoor Units MWM18Y3J MWM24Y3J MWM36Y3J...
Page 37: ...37 OPERATION 18 24kSequenceofOperation...
Page 38: ...38 OPERATION 18 24k Sequence of Operation O o 0 C L A B C D 1 1 4...
Page 39: ...39 OPERATION 18 24k Sequence of Operation...
Page 40: ...40 OPERATION 18 24k Sequence of Operation...
Page 41: ...41 OPERATION 18 24k Sequence of Operation...
Page 47: ...47 INSTALLATION...
Page 48: ...48 INSTALLATION Installation Tools...
Page 95: ...95 TROUBLESHOOTING Malfunction of IDU Fan Motor U8 Service Manual No Start End...
Page 116: ...116 FIgure 901 PARTS CATALOG Indoor Unit MWM09Y1J MWM12Y1J MWM09Y1J MWM12Y1J...
Page 118: ...118 FIgure 902 PARTS CATALOG Indoor Unit MWM18Y3J MWM24Y3J...
Page 123: ...123 FIgure 904 PARTS CATALOG Outdoor Unit MRM09Y1J MRM12Y1J MRM09Y1J MRM12Y1J...
Page 126: ...126 PARTS CATALOG Outdoor Unit MRM18Y3J FIgure 905...
Page 128: ...128 PARTS CATALOG Outdoor Unit MRM24Y3J FIgure 906...