FRIEDLAND SPECTRA Lite Instruction Manual Download Page 1

Lite

3

List Number L110N WHI

BEFORE STARTING ANY INSTALLATION WORK, PLEASE READ CAREFULLY

TOOLS NEEDED 

Drill and 6mm Masonry Drill Bit

Wire cutters and Wire Strippers

No.2 philips Screwdriver

Terminal or Electricians Screwdriver

Large Flat Bladed screwdriver

PARTS INCLUDED

- Bulkhead PIR light
- Instruction Manual
- Accessory pack

Instruction Manual

SAFETY

Always follow the manufacturers advice when using power tools, steps, ladders etc. and wear suitable

protective equipment (e.g. safety goggles when drilling holes).  Before drilling holes in walls, check forhidden

electricity cables and water pipes, the use of a cable/pipe locater maybe advisable if in doubt.

The mains supply to this product should be installed by a competent person (e.g. a qualified electrician) in

accordance with these instructions and in accordance with the appropriate clauses of the current edition of

the IEEE wiring regulations (BS7671).

DANGER - 230 VOLTS. To prevent the risk of electrocution, always turn off the mains electricity supply

before commencing any work on the installation or opening the detector.

It is essential that all connections are made as instructed, that cables are not stressed and that terminals 

are fully tightened.

Suitable for connection to fixed luminaires only.  Internal and connected lamps loads must not exceed the

specified maximums. This product is suitable for wall mounting only.

Summary of Contents for SPECTRA Lite

Page 1: ...pipes the use of a cable pipe locater maybe advisable if in doubt The mains supply to this product should be installed by a competent person e g a qualified electrician in accordance with these instr...

Page 2: ...fuse box by removing the relevant fuse or switching off the circuit breaker before proceeding with the installation SELECTING A 1LOCATION Fig 1 Your PIR Detector has a number of detection zones at va...

Page 3: ...ulated and placed in the termination area For class 1 lights in series with the switched output of the lamp make sure that the earth continuity to the lights is provided use external junction boxes if...

Page 4: ...in order to establish the best position for the sensor head ensuring optimum performance Step 2 Apply the power by switching on the circuit breaker internal wall switch The lamp will immediately illum...

Page 5: ...arkness at which you wish the lamp to become operative i e at dusk slowly rotate the control in a clockwise direction until a point is reached where the lamp illuminates Leave the control set at this...

Page 6: ...ons are loose Check that lamps in the system have not failed and that they are properly seated in their holders Ambient light level may be too high in operational area Adjust the LUX control slowly cl...

Page 7: ...or 500W Fluorescent Time On Adjustment 5 seconds 15 minutes Lux Level Adjustment Day night or night only operation Environmental Protection IP44 Suitable for outdoor use The PIR sensor emits no radia...

Page 8: ...the product in any way the guarantee will be invalidated The guarantee states Novar ED S entire liability It does not extend to cover consequential loss or damage or installation costs arising from th...