INSTALLATION
4.1.
Requirements for installation the serve-over
Installation of the unit must be performed following next requirements:
•
The unit must be aligned horizontally (both depth and length) and installed in
the stable position.
•
Set up the unit only on the designated adjustable legs.
•
It is forbidden to install the unit close to any heating equipment or any HVAC
elements (air outlet etc.).
•
Keep a sufficient distance around the unit. It must be possible to open the doors
without any obstructions.
Fig. 8.
Example of unsuitable ambient conditions
Summary of Contents for VEGA QB HG
Page 1: ...OPERATION MANUAL SERVE OVER VEGA QB LG HG...
Page 6: ...6 1 2 Dimensions Fig 2 Dimensions of Vega QB HG TD Fig 3 Dimensions of Vega QB LG TD...
Page 7: ...7 Fig 4 Dimensions of Vega QB HG LU Fig 5 Dimensions of Vega QB LG LU...
Page 14: ...14 Install the plastic legs Lower the serve over...
Page 17: ...17 Apply silicone to seal the perimeter of connection Push the serve overs together...
Page 21: ...21 Example of installed serve overs...
Page 35: ...35 Date Work Name...