The Initial Maintenance table lists all maintenance
operations that are to be performed at the initial
maintenance (IM) interval. Maintenance operation
numbers are reference numbers used to help you
find detailed instructions in this manual on the main-
tenance operations to be performed. All operations
listed in the table, along with the operations listed in
the applicable M1 maintenance interval table, must
be performed to complete the initial maintenance
(IM).
Maintenance
Operation Number
Initial Maintenance (IM) Operations for Service Schedules I and II
Check
Perform all M1 Operations
Frame Fastener Torque Check
Suspension U-Bolt Torque Check
All-Axle Alignment Check
Bendix Automatic Drain Valve Operating and Leakage Tests
*
Fuel Tank Band-Nut Tightening
*
The automatic drain valve should be inspected every 6 months or 1500 operating hours, whichever comes first.
Table 4, Initial Maintenance (IM) Operations for Service Schedules I and II
General Information
00
Initial Maintenance (IM) Operations: 00–04
New Cascadia Maintenance Manual, October 2020
00/8
Summary of Contents for PE116DC
Page 2: ......
Page 10: ......
Page 26: ......
Page 28: ......
Page 32: ......
Page 34: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 46: ......
Page 48: ......
Page 52: ......
Page 54: ......
Page 62: ......
Page 70: ......
Page 72: ......
Page 78: ......
Page 80: ......
Page 86: ......
Page 88: ......
Page 100: ......
Page 102: ......
Page 104: ......
Page 106: ......
Page 112: ......
Page 130: ......
Page 134: ......
Page 136: ......
Page 142: ......
Page 148: ......
Page 150: ......
Page 154: ......
Page 158: ......