Free2Move eSolutions PowerMeter Installation And User Manual Download Page 3

3

During the installation always follow the PowerMeter manual included in the 
package.

1.

 

Place the PowerMeter provided after the main utility meter and before the split power

2.

 

For the three-phase or single-phase electrical connection, refer to the dedicated 

 

installation manual included in the PowerMeter package.

3. 

Feed the Modbus communication cables through the wallbox box sheath (C). 

 

Suggested cable: STP class 5E, 0.5 mm

2

 section.

4. 

Use the following order for connecting the communication cables from the 

 

PowerMeter to the Wallbox. Starting from left on the wallbox RS485 output port 
“CN12”, connect:

 

GND to SC

 

 

RS485-B to B

 

RS485-A to A

 

 

Utility Meter

Wallbox

PowerMeter

Loads

Eletrical panel

RS485 Port  CN12

CN12 Port

Wallbox

PowerMeter

GND B A

A SC B

 

 

Utility Meter

Wallbox

PowerMeter

Loads

Eletrical panel

RS485 Port  CN12

CN12 Port

Wallbox

PowerMeter

GND B A

A SC B

Reviews: