67
Line stability test
Perform the following steps for each line:
1.
Install the needle valve kit, pressure gauge and leak generator into the STP manifold. Purge
the line by dispensing from each fueling point starting with the dispenser furthest from the
tank. The STP should be running the full time that the line is purged.
2.
Once the line is purged, turn the STP off and monitor the pressure on the pressure gauge.
The pressure should not change more than 5 PSI (34.5 kPa) in 5 minutes. If it does not
change more than 5 PSI in 5 minutes proceed to the learn process. If the pressure changes
more than 5 PSI purge the lines again, and re-test.
LS-500 reports
Line test reports are available on demand from the ATG or using TSA. The reports can also be
set in the rules. Several report options may be used to print or save generated reports. For
more information on reports in general, please refer to either the
Fuel Management System
Programming Guide T5 Series
(000-2142) or the
Fuel Management System Operator's Guide T5
Series
(000-2151).
LS-500 line leak reports
LS-500 Line Leak Reports include any line tests completed within the date range chosen by the
user. An example of an LS-500 report can be found below.
Summary of Contents for KWIK TRIP EVO 5000
Page 6: ...Intentionally Blank ...
Page 10: ...4 Intentionally Blank ...
Page 65: ...59 Typical wiring cabinet layout ...
Page 66: ...60 Intentionally Blank ...
Page 83: ...Intentionally Blank ...
Page 84: ...AG 013 r3 ...