INSTALLATION
Typical Installation
5
INSTALLATION
Typical Installation
Typical Installation
1
2
3
4
5
6
7
8
9
10
11
12
1. Gate Valve
4. Switch Power
7. Discharge
10. Caulking Hub
2. Check Valve
5. Pump Power
8. Gas Tight Basin
11. 3/16
"
Air Bleed Hole
3. Union
6. Vent
9. Intake
12. Tethered Float (refer to the
Specifications tables for ON-OFF levels)