Frama Fx 5 Series Quick Installation Manual Download Page 1

Connect the weighing platform connector 

(e)

 into the COM PORT on the 

back of the machine. Then connect the LAN cable 

(f) 

and power cable 

(g) 

to each side of the machine. 

7

Open the cover. Place the meter 

(i)

 into the meter compartment and push

backwards until it fits securely into position. Close the cover.

3

Machine components:

Machine Base

Feeding Table

Catch Tray

Weighing Platform

LAN Cable

Power Cable

Postage Meter

(PSD)

Ink Cartridge

Unpack all components from the box, remove packaging  

and any transit tape.

1

Lift machine slightly on the left hand side and align the hooks to attach the feeding table 

(b)

 – 

align the catch tray 

(c) 

to the right hand side of the machine.

5

Lower weighing platform release panel at the back of 

the machine. Place weighing platform 

(d)

 on top of the 

machine and slide forward to lock. Lift panel to secure 

and clip cable into place.

Insert the ink cartridge 

(h)

 at an angle into the machine with the ‘TOP’ and ‘LOCK’ 

stickers facing upwards. Push the ink cartridge 

(h) 

towards the back of the machine 

until you hear a ‘click’ - close the cover of the machine.

Turn on the machine using the switch behind the 

power cable 

(g) 

and follow the steps on screen.

8

Lift the cover of the machine to reveal the ink 

cartridge 

(h) 

and meter 

(i)

 bays.

2

6

4

Back of the machine

Weighing Platform 

Cable

Fx Series 5

Quick Installation Guide

For more information or if you experience any 

issues, please visit : 

www.frama.co.uk/Fx5

Select LAN and press 

 to test connection type.

OK

Installation Process

1 LAN

9

Follow the steps on screen to complete the procedure

Next

Installation Process

Press the ‘Next’ to start the 

Online service

declaration.

10

Mem

Mem

11

Your machine is now ready 

to use. Please turn over

for your 

Quick Start Guide

.

Remove tabs from 

print heads before 

inserting into unit!

Reviews: