Part No. 26108 Rev. C December 2015
- 10 -
5000 Series Cabinets
Preparation
HEATED CABINETS
-
OPERATION
Shelf Location
and Ticketing
All shelves are adjustable in height and can easily be
moved up or down, to match product size.
The movement is restricted to 50mm, because of the
electric cables to the lights. For greater movement
contact the manufacturer or supplier for advice, as
electrical modifications may be required.
The front and rear edges of the
shelves are profiled to carry
ticketing/labels.
Shelf
Adjustment
To move the shelf support
brackets, remove all the shelves
and then remove the rear sliding
doors. Using two people, one on
each bracket, slide the bracket
upwards and disengage it from
the support pillar. Insert the
bracket in the new position and
push it down firmly. Replace all
shelf trays and doors.
The brackets can be inserted in
two positions, allowing the
shelves to be either horizontal or
sloping downwards.
Caution
Make sure shelf brackets are pushed down as far as they can go. Failure
to do this may result in shelf collapse, when loaded with product.
Power Supply
Ensure that power is connected to the cabinet.
Turn on the main power switch, as shown above.
Continued on next page