
Installation and commissioning
11
3
Installation and commissioning
Step 1:
Unpacking and checking the contents of the package
Warning!
Do not start operating PostBase Mini if parts are damaged or
missing. Please contact the Customer Support.
Caution!
Carry out the steps exactly in the given order. Also, consult the
installation instructions (fold-out).
1
2
3
4
5
6
7
9
8
1
PostBase Mini franking machine
2
Ink cartridge
3
Power cable
4
Power supply unit
5
USB cable
6
Ethernet cable
7
‘First steps’ manual
8
Installation instructions (flyer)
9
Weighing platform
(version as ordered)
Summary of Contents for Postbase Mini
Page 1: ...Franking machine Operator Manual Reference Guide...
Page 86: ...PostBase Mini 86...
Page 89: ...Appendix Technical Data 89 Declaration of conformity...
Page 104: ...PostBase Mini 104...
Page 105: ...For your notes 105...
Page 106: ...For your notes 106...
Page 108: ...51 0053 3810 00 Rev 06 2021 01 xxx helbig berlin...