![FP optimail Operator'S Manual Download Page 53](http://html1.mh-extra.com/html/fp/optimail/optimail_operators-manual_2325897053.webp)
Appendix - Instructions for installation and commissioning
53
Scope of delivery:
1
optimail franking machine
2
Power cable
3
Modem cable
4
Ribbon cassette
5
Keys, 2
6
Operator manual and quick reference
7
PIN Card (not shown)
Step 3: Installing optimail
• Choose an installation site with the following
ambient conditions:
– Room temperature 10°C to 40°C
(The best printing quality is achieved at a room
temperature of 15°C to 35°C.)
– No direct sunlight
– Power socket in the immediate vicinity.
• Place the optimail on a firm, level, horizontal base.
Step 4: Inserting the ribbon cassette
• Open the flap of the ribbon cassette compartment
by lightly pressing the release key.
The flap swings up automatically to the stop.