PRESIDIO
NOTE:
If connecting to a campsite sewer inlet, DO NOT open termination valves until tanks are
¾ full. DO NOT keep black water valve open while parked. Wastes are NOT flushed directly
into the sewer system. Only liquid waste is drained, therefore, water must accumulate, and
chemicals in tank need time to break down solids before they can be released. If draining gray
water tank directly into sewer inlet while parked, make sure to close termination valve for a
period of time before leaving, allow some water to accumulate in tank to use for flushing drain
line and flexible hose.
The toilet operates from either the fresh water tank or city water supply. The water pump must
be turned ON when not connected to a city water supply.
Operation:
• To add water to the toilet, depress the foot lever
halfway to the floor.
• To flush the toilet, depress the foot lever
completely to the floor until rinse clears the bowl.
• Release foot lever by allowing it to snap back,
which permits positive sealing around the flush
ball. A small amount of water should remain in
the bowl.
Unnecessary frequent flushing of the stool will quickly
deplete your fresh water supply and fill your holding tank.
If the black water tank becomes full, you will no longer be
able to flush the stool until the tank can be drained.
Cleaning:
The toilet should be cleaned regularly for maximum sanitation and operational efficiency.
Clean the toilet bowl with a mild bathroom cleaner. DO NOT use chlorine or caustic chemicals,
such as drain opening types, as they will damage the seals.
NOTE:
Refer to the Toilet Manufacturer’s Owner’s Manual for detailed information regarding
usage and maintenance of the toilet.
10-6
WATER SYSTEMS
Toilet
Summary of Contents for 2007 Presidio
Page 1: ...PRESIDIO PRESIDIO 03 2007...
Page 2: ...PRESIDIO...
Page 10: ...PRESIDIO TABLE OF CONTENTS...
Page 16: ...PRESIDIO LIMITED WARRANTY 1 6...
Page 18: ...PRESIDIO LIMITED WARRANTY 1 8...
Page 19: ...PRESIDIO LIMITED WARRANTY 1 9...
Page 20: ...PRESIDIO LIMITED WARRANTY 1 10...
Page 128: ...PRESIDIO 9 20 ELECTRICAL SYSTEMS...
Page 140: ...PRESIDIO 10 12 WATER SYSTEMS...
Page 150: ...PRESIDIO 11 10 PROPANE GAS SYSTEMS...
Page 168: ...PRESIDIO 12 18 CARE MAINTENANCE...