Fortinet TalkSwitch 8plus Installing Manual Download Page 1

Installing an 8plus upgrade module

The TalkSwitch

®

8plus upgrade module adds eight VoIP ports to TalkSwitch systems. These

instructions outline the procedure to follow for this installation and provide words of caution

to prevent equipment damage.

Step 1: Prepare the TalkSwitch

®

unit for disassembly

Turn the TalkSwitch unit off, and remove all connections including incoming phone lines,

extension phone lines, LAN, and the AC adapter. It is a good idea to label the phone cords

so you know where to reconnect them. Place the unit on an anti-static mat and ground

yourself using a grounding link, or carefully follow the caution guidelines in the left margin.

Step 2: Remove top cover 

Locate and remove the two screws on the bottom of the TalkSwitch unit using a Phillips

screw driver. Remove the top cover by lifting it straight up.

Step 3: Insert upgrade module into unit

The board connector pins (see TalkSwitch 48-CA or VS unit photo on reverse) on the unit

board must connect with the connector socket on the upgrade module (see 8plus upgrade

photo next page). If the steps outlined below are not done properly, you could bend the pins

and damage the board — work carefully.

1. Carefully lay the upgrade module directly on top of the unit board so that the connector

pins from the unit board match exactly with the sockets in the upgrade module

connector — do not apply pressure.

2. Look directly down the screw holes of the upgrade module and align the holes with the

hex spacers below.

3. Using your thumb, slowly apply pressure to the top of the upgrade module connector by

pressing straight down. You should feel the pins on the top board insert into the

upgrade module connector. If it is difficult to press down, stop immediately. The pins on

the unit board may not be straight and vertical. Lift the upgrade module off and realign

the connectors following the previous instructions. 

4. Finish by pressing firmly on the top of the upgrade module connector. The unit

connector copper pins will be inserted into the socket on the upgrade module. (Once

inserted successfully, the pins from the unit connector appear through the top of the

upgrade module connector.)

5. Install the two screws through the upgrade module into the hex spacers below it. Do not

tighten screws too much.

Hex spacers for board
mounting screws

TalkSwitch VS unit

Locate the hex spacers and connector

 positions in the photo for reference 

in  completing Step 3.

Board 
connector pins

CAUTION: TalkSwitch unit

may be damaged if it comes in

contact with static electricity.

Make sure you are properly

grounded before proceeding. We

recommend that you use an anti-

static mat and grounding link,

otherwise follow these guidelines:

1. Don’t work on a carpet.

2. Place the upgrade module and

TalkSwitch unit on a hard

surface such as a table or

counter top.

3. Don’t pass the upgrade module

between two people. Place it on

a counter top first. The other

person can then pick it up.

Reviews: