Fortinet FIM-7941F Manual Download Page 14

Hardware installation

Fortinet Technologies Inc.

Hardware installation

This chapter describes installing a FIM-7941F interface module into a FortiGate-7000 chassis.

Installing QSFP-DD, QSFP28, QSFP+, SFP+, and SFP transceivers

You must install QSFP-DD, QSFP28, or QSFP+ transceivers into the FIM-7941F front panel 19 and 20 fabric channel
interfaces before connecting them to 400Gbps, 100Gpbs, or 40Gbps networks. You can install the transceivers before or
after inserting the FIM-7941F module into a chassis.

You must install QSFP28 or QSFP+ transceivers into the FIM-7941F front panel 1 to 18 fabric channel interfaces and the
M1 and M2 base channel interfaces before connecting them to 100Gbps or 40Gbps networks. You can install the
transceivers before or after inserting the FIM-7941F module into a chassis.

You must install SFP28 or SPF+ transceivers into the FIM-7941F M3 and M4 interfaces before connecting them to
25Gbps or 10Gbps networks.

To install transceivers

To complete this procedure, you need:

l

A FIM-7941F

l

Transceivers to install

l

An electrostatic discharge (ESD) preventive wrist strap with connection cord

FIM-7941Fs must be protected from static discharge and physical shock. Only handle or work
with FIM-7941Fs at a static-free workstation. Always wear a grounded electrostatic discharge
(ESD) preventive wrist strap when handling FIM-7941Fs.

Handling the transceivers by holding the release latch can damage the connector. Do not force
transceivers into their cage slots. If the transceiver does not easily slide in and click into place,
it may not be aligned correctly. If this happens, remove the transceiver, realign it and slide it in
again.

1.

Attach the ESD wrist strap to your wrist and to an available ESD socket or wrist strap terminal.

2.

Remove the caps from the cage sockets on the FIM-7941F front panel.

3.

Hold the sides of the transceiver and slide it into the cage socket until it clicks into place.

FortiGate-7121F cable bracket kit

The FortiGate-7121F chassis includes an optional cable bracket kit that you can install to help manage the network
cables connected to FIMs and FPMs installed in the chassis.

FIM-7941F 6.4.8 Interface Module Guide

14

Summary of Contents for FIM-7941F

Page 1: ...FIM 7941F Interface Module Guide FortiGate 7000F Series...

Page 2: ...fortinet com FORTINET TRAINING CERTIFICATION PROGRAM https www fortinet com support and training training html NSE INSTITUTE https training fortinet com FORTIGUARD CENTER https fortiguard com END USER...

Page 3: ...ssis 16 Shutting down and removing a FIM 7941F module from a chassis 20 Troubleshooting 25 FIM 7941F does not startup 25 Quick FIM 7941F configuration 26 Registering your FortiGate 7000 series product...

Page 4: ...Change log Date Change description March 25 2022 Initial release FIM 7941F 6 4 8 Interface Module Guide 4 Fortinet Technologies Inc...

Page 5: ...orts more advanced features You cannot include a FIM 7941F and FIM 7921F in the same FortiGate 7000F chassis In an HA configuration both chassis in the HA cluster must have the same FIMs The FIM 7941F...

Page 6: ...ssis backplane connectors When both module levers are fully closed the power sliders can be lowered to their bottom position locking the module levers and turning on power to the module Raise the powe...

Page 7: ...el two Ethernet management interfaces MGMT1 and MGMT2 and a USB port The USB port can be used with any USB key for backing up and restoring configuration files and installing and restoring firmware Co...

Page 8: ...interfaces are used for HA heartbeat and session synchronization between FIM 7941Fs in different chassis These interfaces can also be used for management communication for example for remote logging...

Page 9: ...ly Off The FIM 7941F is powered off 1 to 20 M1 and M2 Green The correct cable is connected to the interface and the connected equipment has power and is connected at 400Gbps 100Gbps or 40Gbps Flashing...

Page 10: ...set split port 1 P3 2 P16 2 M1 end The FortiGate 7000F reboots and when it starts up l Interface 1 P3 has been replaced by four 25GigE CR2 interfaces named 1 P3 1 to 1 P3 4 l Interface 2 P16 has been...

Page 11: ...global set qsfpdd 100g port 1 P19 2 P20 end The FortiGate 7000F reboots and when it starts up interface 1 P19 and 2 P20 are operating as 100GigE QSFP28 interfaces Splitting the P19 or P20 interfaces i...

Page 12: ...terrupt NMI switch to assist with troubleshooting Pressing this switch causes the software to dump registers backtraces to the console After the data is dumped the FIM 7941F reboots While the FIM 7941...

Page 13: ...ule Fortinet Technologies Inc FIM 7941F hardware architecture Chassis Base Backplane Chassis Fabric Backplane Integrated Switch Fabric 11 x 50G 1T 10 x 400G 5 x NP7 NP 0 4 Ch i CPU FIM 7941F 6 4 8 Int...

Page 14: ...dure you need l A FIM 7941F l Transceivers to install l An electrostatic discharge ESD preventive wrist strap with connection cord FIM 7941Fs must be protected from static discharge and physical shock...

Page 15: ...On some FIM modules there may be very little clearance between the front panel interfaces and the module lever on the right side of the FIM 7941F In fact you may have to remove network connectors from...

Page 16: ...odule to get power and start up If the module is not receiving power all LEDs remain off FIM 7941F modules are hot swappable This procedure is the same whether or not the chassis is powered on Do not...

Page 17: ...odule into the slot stop at about 1 2 inches from fully inserting it Module levers Module levers Slide in slowly Stop position 3 Unlock the left and right module levers by pushing the power sliders up...

Page 18: ...rted into chassis Apply moderate force to push the module slowly into the slot Stop Position Levers engage with chassis 5 Close both levers by pushing them into contact with the module front panel Clo...

Page 19: ...ly tighten the two secure screws Do not use a power screwdriver because the high torque and speed can damage the chassis or screw thread After tightening both secure screws the module is fully seated...

Page 20: ...ered on check the module LEDs to verify that the module is operating correctly LED Normal operation state Status Green Alarm Off HA Off Power Green Shutting down and removing a FIM 7941F module from a...

Page 21: ...rom static discharge and physical shock Only handle or work with FIM 7941Fs at a static free workstation Always wear a grounded electrostatic discharge ESD preventive wrist strap when handling FIM 794...

Page 22: ...ly loosen the secure screws otherwise the levers may be damaged when used to eject the module from the chassis slot Do not use a power screwdriver because the high torque and speed can damage the chas...

Page 23: ...levers by pushing the power sliders up until the levers pop open Push the power sliders up to fully open both levers If the chassis is powered on this step turns off the module s power Levers pop ope...

Page 24: ...evers and eject the module from the chassis Levers opened Rotate to open Module ejects Module ejected 6 Hold the levers to slide the module part way out of the chassis slot Then grasp the module by th...

Page 25: ...e correctly aligned fully inserted and locked and the secure screws are tightened Firmware problem If the FIM 7941F is receiving power and the sliders and levers are fully closed and you have restarte...

Page 26: ...ttps support fortinet com To register enter your contact information and the serial numbers of the Fortinet products that you or your organization have purchased Choosing the configuration tool You ca...

Page 27: ...an reset the FIM 7941F to the factory defaults and start over From the CLI enter execute factoryreset Connect to the GUI by connecting MGMT1 of the module in slot 1 to your network and browsing to htt...

Page 28: ...ge de l quipement dans le rack doit tre telle qu une situation dangereuse n est pas li un chargement m canique in gal Circuit Overloading Consideration should be given to the connection of the equipme...

Page 29: ...ally crushing or cutting it can result in an explosion Leaving a battery in an extremely hot environment can result in leakage of flammable liquid gas or an explosion If a battery is subjected to extr...

Page 30: ...residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense WARNING Any changes or modifications to this product no...

Page 31: ...SMI RoHS table are available at the link below RoHS Table https www fortinet com bsmi 176 2 02 27961666 China A Ag ncia Nacional de Telecomunica es ANATEL Brazil Este produto n o apropriado para uso e...

Page 32: ...inet enters a binding written contract signed by Fortinet s General Counsel with a purchaser that expressly warrants that the identified product will perform according to certain expressly identified...

Reviews: