Venetian Corner Arbour
Fixing Pack (ACARBFP)
Not to Scale
POZI DRIVE SCREWDRIVER
DRILL
HAMMER
Important :
Assembly of this
arbour requires a
minimum of two
adults.
B
C
E
A
ACARBLHORA
LEFT HAND RAFTER
Profile
Profile
Profile
ACARBSL
BENCH LEG
ACARBRHPA
RIGHT HAND PANEL
ACARBTINS
TOP INSERT Qty 2
ACARBRHORA
RIGHT HAND RAFTER
ACARBIRA
INNER RAFTER Qty 2
ACARBLHPA
LEFT HAND PANEL
ACARBBI
BACK INSERT Qty 2
ACARBCPTS
LARGE CORNER POST TOP
ACARBRB10
Qty 3
ACARBRS
ROOF SUPPORT
ACARBRB1
Qty 3
ACARBRB9
Qty 3
ACARBRB8
Qty 3
ACARBRB7
Qty 3
ACARBRB6
Qty 3
ACARBRB4
Qty 3
ACARBRB11
Qty 3
ACARBRB3
Qty 3
ACARBRB5
Qty 3
ACARBRB12
Qty 3
ACARBRB2
Qty 3
CARB PARTS LIST
F
G
D
H
I
J
K
M
R2
R3
R4
R5
R6
R7
R8
R9
R10
R1
R11
R12
ROOF PACK
2
Issue 0214
1
ACARBCPBS
LARGE CORNER POST
ACARBRHBB
RIGHT HAND BENCH BACK
ACARBLHBB
LEFT HAND BENCH BACK
ACARBRHB
RIGHT HAND BENCH
ACARBLHB
LEFT HAND BENCH
L
N
O
IMPORTANT, RETAIN FOR FUTURE REFERENCE;
READ CAREFULLY
- Always pre-drill the timber to avoid splitting.
- The timber in this product is pressure treated to
ensure longevity and protection against rot. This may
leave colour variations, but these will even out as the
moisture content stabilises
- Timber is a natural material and will shrink and swell
as a result of varying moisture content.
- Please keep all plastic bags and small parts away
from children
-
Warning.
Only for domestic use
- This product must be built on a solid level base.
Technical Help line:
0333 7777 089
8.30 am and 5.00
pm Monday to Friday.
In line with your statutory rights, please check all parts
prior to assembly, as assembly of damaged parts may
be deemed to be acceptance and this may affect the
remedies you are entitled to. If the product is not
constructed in accordance with the instructions, or is
altered in anyway (e.g. painted), the manufacturer
cannot be held liable for any resulting damage.
Fix the back insert to the left hand panel using 2 x 70mm screws, screwing through the back insert’s
framework into the post.
(Make sure the insert is inline with the back and top of the left hand panel.)
Place the assembled post against the back insert and fix the insert to the post using 2 x 70mm
screws.
(USE A TAPE MEASURE TO MAKE SURE THE POST IS IN LINE WITH THE BOTTOM OF THE SIDE PANEL.)
Slot the two posts together and fix using the two coach bolts.
I
H
A
C
H
Forest Garden Ltd, Unit 288 Hartlebury
T
rading Estate, Hartlebury
, W
orcestershire, DY10 4JB
A
C
MUST PRE DRILL
TAPE MEASURE
SPIRIT LEVEL
120mm SCREW Qty 4
M8 x 70mm COACH BOLT Qty 2
M8 x 70mm NUT Qty 2
M8 Washer Qty 2
25mm SCREW Qty 138
70mm SCREW Qty 36
90mm SCREW Qty 4
100mm SCREW Qty 4
60mm SCREW Qty 8
Panel flush with
the top of the
angled post
Profile