background image

Shiplap Pent Shed

6' x 4' 

Important : 

Assembly of this 

shed requires a 

minimum of two 

adults.

Issue 0215

B

SDP6BK

BACK PANEL 

SDP4RHS

RIGHT SIDE

179112808

ROOF SHEET

D

E

F

A

SDP64 PARTS LIST

BRDFL46

FLOOR

SDRDT

DOOR 

SDP6FR

FRONT PANEL 

40121830PARDTR

1830mm CORNER STRIP QTY 2

G

Place the corner strips so that they cover the joins between 
the panels. Fix each in place using 3 x 30mm screws

2

4

1

1

C

SDP4LHS

LEFT SIDE

3

REQUIRED TOOLS : 
(NOT SUPPLIED)

TAPE MEASURE

HAMMER

PCWIN1

WINDOW QTY 1

H

Top View

B

D

A

Must Pre drill for 
each screw used.

FELT QTY 1

85008

Fixing Pack (SDP64FP)

This fixing pack is used for several products. 
There may be additional fixings.

Not to Scale

Flush Hinge 

Qty 2

50mm Screw Qty 22

30mm Nail Qty 42

25mm Screw Qty 19

Hasp & Staple

30mm Screw Qty 25

10mm Felt tacks

 Qty 80

SHARP KNIFE

A

C

Z’ bracket Qty 2

40121717PARDTR

1717mm CORNER STRIP QTY 2

37281791

1791mm BATTEN QTY 2

59121280PDT

1280mm BARGE BOARD QTY 2

37281699

1699mm BATTEN QTY 1

25120675PDT

675mm STRIP QTY 1

84996

675mm PLASTIC STRIP QTY 3

F

 I

J

K

L

M

N

P

B

C

D

A

 J

O

59121815PDT

1815mm BARGE BOARD QTY 1

 

25mm Security Screws

Screws Qty 8

FLAT HEAD 

SCREWDRIVER

POZI DRIVE 

SCREWDRIVER

SCISSORS

 

Place the hinge against the inside of the door frame 
and position the large section of the hinge so that it is 
flush with the inside of the framing, as shown. Fix 
with 25mm screws.

Open the hinge and fix the smaller section to the 
door framing. Again make sure that the hinge is flush 
and that the holes are positioned so that the 25mm 
screws locate correctly into the batten.

 

Q

20121710PDT

20x1710mm STRIP QTY 1

 I

Position the staple on the door end in line with the centre batten on the reverse of the door. 
Make sure that the staple is in line with the framing behind. Fix in place using 2 x 25mm 
screws.

Before fixing the Hasp to the door make sure that it is in line with the framing on the reverse of 
the door and that it closes over the Staple. Fix this in place using 3 x 25mm screws.

 

Place the panels on top of the floor. Make sure that all the panels are tight and flush 
before fixing them to each other using 3x50mm screws.

Before fixing each panel to the floor make sure that the panels are sitting flush and fix 
them in place using 50mm screws. position each screw so that it locates into the bearers 
underneath.

3x50mm screws for the front and back panels.
2x50mm screws for the side panels.

IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ 

CAREFULLY

This building is pre-treated with a factory base coat for 
protection during storage and transit. We recommend that 
you treat your new building as soon as possible after 
assembly using a wood preservative treatment. Apply in 
accordance with the manufacturers instructions.

- This product must be built on a solid level base.
- The roof of this building is not a load bearing structure.
- Timber is a natural material. It will shrink and swell as a 
result of varying moisture content.
- Due to the nature of the material the doors may need some 
trimming for a neater fit.
- Please keep all plastic bags and small parts away from 
children

Technical Helpline:

 0333 7777 089

  8.30 am and 5.00 

pm  Monday to Friday.

Please check all parts prior to assembly

Assembly of damaged parts may be deemed to be 
acceptance and this may affect the remedies you are entitled 
to. 
If the product is not constructed in accordance with the 
instructions, or is altered in any way (e.g. painted), the 
manufacturer cannot be held liable for any resulting damage.

Staple

Hasp

Fix the 20 x 1710mm strips to the side of the 
door frame so that it is tight with the cladding 
and flush with the frame. Use 3 x 30mm 
screws for each.

Q

A

Reviews: