Krystal Enterprises
53
Lift Closed
Lift Extended
Lift Lowered
In the event of an electrical system failure,
this lift system provides for full manual op-
eration. Locate the back-up pump release
valve, and the hand pump handle on the
motor housing.
To Unfold the Platform
1. Place the
slotted end of the pump handle onto
the back-up pump release valve, and
turn counterclockwise until the platform
reaches fl oor level.
2. Turn the release valve clockwise to stop
the platform (make sure valve is tight but
not over tight)
To Lower Platform and Roll Stop
1. Repeat step 1 in the previous procedure
to lower the lift to the ground level.
To Fold Roll Stop and Raise Platform
1. Place the slotted end of the pump
handle onto the back-up pump release
valve, and turn clockwise to close valve.
2. Insert handle into back-up pump, and
pump until platform reaches fl oor level.
To Fold Platform Up
1. Repeat step 2 above until fully upright.
Emergency Back-Up Operation
Note:
Refer to Operator’s Manual for Detailed Operating & Maintenance Procedures
Braun Rear Door Wheelchair Lift
Summary of Contents for Econline Super Duty Chassis 450 1998 Series
Page 2: ...ProCarManuals com ...
Page 39: ...Krystal Enterprises 39 THIS PAGE IS INTENTIONALLY BLANK ProCarManuals com RETURN TO MENU ...
Page 95: ...Krystal Enterprises 95 95 THIS PAGE IS INTENTIONALLY BLANK ProCarManuals com RETURN TO MENU ...
Page 107: ...Krystal Enterprises 107 107 F 550 Shuttle Bus Wiring Diagram ProCarManuals com RETURN TO MENU ...