303-01B-124
Engine — 1.6L / 1.3L RoCam
303-01B-124
INSTALLATION (
CONTINUED
)
E6646 EN
07/2001 2002 Bantam
36. Install the ground cable, the electrical
connectors and the transmission breather.
1. Ground cable
2. Generator electrical connector
3. Starter motor electrical connector
4. Transmission breather
37. Install the left-hand coolant hose bracket.
38. Install the right-hand coolant hose bracket.
39. Install the coolant hoses.
1. To coolant expansion tank
2. To cabin heater
3. From cabin heater