
22
Install the S4810
Install the SFP+ and QSFP+ optics
The S4810 has 48 SFP+ optical ports and 4 QSFP+ optical ports. For supported optics, refer to
www.force10networks.com/products/specifications.asp
.
To install SFP+ or QSFP+ optics into an open port, follow the steps below:
3
Attach the one-hole lug to the chassis as shown, using the supplied 10-32 screw with captive internal
tooth lock washer. The screw should be torqued to 20 in-lbs.
4
Attach the other end of the ground cable to a suitable ground point. The rack installation ears are not
a suitable grounding point.
Attention:
Electrostatic discharge (ESD) damage can occur if components are mishandled. Always wear
an ESD-preventive wrist or heel ground strap when handling the S4810 and its components.
Attention:
Follow all warning labels when working with optical fibers. Always wear eye protection when
working with optical fibers. Never look directly into the end of a terminated or unterminated fiber or
connector as it may cause eye damage.
Step
Task
1
Position the optic so it is in the correct position. (The optic has a key that prevents it from being
inserted incorrectly.)
Step
Task (Continued)
Lug Hole
Ground
Screw