background image

           BALI RTN

IST 03 C 358 - 01

INSTALLATION, USE

AND MAINTENANCE

EN

Summary of Contents for BALI RTN 18

Page 1: ...BALI RTN IST 03 C 358 01 INSTALLATION USE AND MAINTENANCE EN...

Page 2: ...Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly 2...

Page 3: ...materials can be recycled and must be taken to specific separated collection areas Keep the packing out of reach of children as by its very nature it may constitute a source of danger Should the equip...

Page 4: ...12 3 1 Installation standards page 12 3 2 Installation page 12 3 2 1 Packaging page 12 3 2 2 Choosing where to install the boiler page 12 3 2 3 Installing the boiler page 12 3 2 4 Ventilation of boil...

Page 5: ...ly Burner cut out LED red only E models 7 This light indicates that the burner safety device has tripped due to a malfunction Burner operation LED yellow 8 This light indicates that the burner is oper...

Page 6: ...he case of LPG boilers there may be airlocks in the pipes The boiler s burner may cut out a few times Restart the burner using the reset button see the following paragraphs 1 2 2 Switching off For E m...

Page 7: ...intenance The user is obliged to have routine maintenance done on the boiler and the burner once a year Correct maintenance of the boiler allows it to work under the best conditions protects the envir...

Page 8: ...1992 European Community Low Voltage Directive 73 23 EEC dated 19th February 1973 as amended by Directive 93 68 EEC dated 22nd July 1993 and they are fitted with all the safety devices called for in th...

Page 9: ...25 G1 1 2 G1 1 2 G 3 4 110 RTN RTN E 24 525 G1 1 2 G1 1 2 G 3 4 130 RTN RTN E 32 RTN RTN E 36 625 G1 1 2 G1 1 2 G 3 4 130 RTN RTN E 48 765 G1 1 2 G1 1 2 G 3 4 150 MODEL L mm Flow M Return R Gas G Flue...

Page 10: ...perature C 45 85 Electrical power supply V Hz 230 50 Electrical power W 10 Fuse on power supply A 4 Natural gas G20 CO2 value 5 8 5 5 6 4 6 5 7 0 Flue gas temperature C 110 120 110 120 120 130 120 130...

Page 11: ...er supply V Hz 230 50 Electrical power W 20 Fuse on power supply A 4 Natural gas G20 CO2 value 6 5 6 3 6 8 5 5 5 5 Flue gas temperature C 110 120 110 120 120 130 110 120 110 120 Flue gas mass flow Kg...

Page 12: ...d return pipes Remember that the plumbing system must include all the safety and control elements required in terms of current standards safety valve water pressure switch heat discharge valve pressur...

Page 13: ...earth the system Gas water or heating system pipes are not suitable for earthing the system 3 2 9 Plumbing connections Before installation the boiler should be cleaned in order to remove as far as po...

Page 14: ...ns 3 5 Wiring diagrams BC Flame control EA Ignition electrode ER Flame detection electrode F1 Protection fuse F4A 250V IG Main switch marked on off on the printed circuit L1 Flue gas thermostat gas pr...

Page 15: ...3 5 1 General layout mod 18 48 RTN E fig 7 mod 18 48 RTN fig 6 15...

Page 16: ...mod 70 100 RTN E fig 9 mod 60 RTN E fig 8 16...

Page 17: ...mod 18 48 RTN E 3 5 2 Topographical diagrams fig 7A mod 18 48 RTN fig 6A 17...

Page 18: ...mod 60 RTN E fig 8A mod 70 100 RTN E fig 9A 18...

Page 19: ...or leaks especially the points that were disconnected Affix the self adhesive label provided that indicates the type of gas and pressure for which the equipment is set 19 4 MAINTENANCE In order to ens...

Page 20: ...40 Tel 39 0365 878 31 Fax 39 0365 878 524 e mail info fondital it www fondital com The producer reserves the right to modify the data contained herein at any time without prior notice Uff Pubblicit Fo...

Reviews: