background image

6

self-contained 

BIN • RIDE Technology

Prepare the bin

3

Bin preparation

  •  Remove protective tape from gaskets

Bin top preparation

3.1

 ➌

  •  Apply gaskets 

  •  Install shuttle actuator 

➋ 

through 

dispenser top and secure with locking nut 

Bin top preparation

3.2

Summary of Contents for Horizon Elite Chewblet H C1010ABS Series

Page 1: ...e 877 612 5086 1 610 252 7301 www follettice com Horizon Elite Ice Machine Models with RIDE Technology Installation Instructions for Ice Storage Bins H_D710ABS H_E710ABS H_C1010ABS H_C1410ABS H_C1010W...

Page 2: ...t type environments catering and similar non retail applications WARNING To avoid a hazard due to instability of the appliance it must be fixed in accordance with the instructions Configuration Applic...

Page 3: ...gy self contained 3 8 7 5 6 4 3 2 1 Read and complete the following 8 installation steps Front cover Internal connection External connection Docking assembly Bin preparation Site preparation Unpack Ic...

Page 4: ...ntained BIN RIDE Technology Carefully unpack and inspect the contents of your Follett ice machine 1 Unpack 7 16 7 16 DO NOT TILT ICE MACHINE TO ACCESS BOLTS COMPRESSOR DAMAGE WILL RESULT Unpack ice ma...

Page 5: ...cated circuit 1 50 mm2 wire H_E1410A W requires 20A dedicated circuit 4 00 mm2 wire Plug must be provided by end user and must conform to standard EN 60 335 2 24 of the end destination Potable water s...

Page 6: ...IDE Technology Prepare the bin 3 Bin preparation Remove protective tape from gaskets Bin top preparation 3 1 Apply gaskets Install shuttle actuator through dispenser top and secure with locking nut Bi...

Page 7: ...bly to machine stand accessory Prior to installing the docking assembly ensure that the drain fitting is oriented right or left correctly for your installation An optional straight drain fitting is al...

Page 8: ...e must drain towards ice machine Ice transport tube to bin Be sure tube ends are square Heat end of transport tube in cup of 160 F 71 C hot water to soften and spread with pliers before making connect...

Page 9: ...ng to the 3 4 barb Connect the 1 slip fitting to the 1 stand pipe drain Note Minimum 8 radius on silicone drain line Drain line from the ice machine must have at least 1 4 per foot pitch 6 4 mm 0 3 m...

Page 10: ...ute 3 8 drain tubing through knockout in back of docking station and insert fully into John Guest fitting connection at the rear of the machine chassis Route other end of 3 8 drain tubing to drain Dra...

Page 11: ...utgoing line from shut off valve into push in connection of water solenoid Connect docking assembly to ice machine 7 Internal connections Air cooled ice machines follow steps 7 1 through 7 5 CAUTION P...

Page 12: ...HIGH for extended service life LOW for low scale water Set TDS switch 7 5 If water solenoid is already mounted to evaporator Insert potable water line into shut off valve If this is an undercounter in...

Page 13: ...plug Power cord 7 10 Connect cooling water lines to ice machine Water valve is set at the factory DO NOT remove seal or adjust water valve Cooling lines and power 7 9 CLEANER FULL DRAIN CLOG HIGH PRE...

Page 14: ...wo screws through cover and into docking assembly For air cooled machines only install plastic grill Install front cover CAUTION Keep ventilation openings in the appliance enclosure clear of obstructi...

Page 15: ...ined 15 max 2 ft 0 6m 1 0 3m 1 4 6 4mm Pitch ice transport tube to allow melt water to drain towards ice machine Secure insulated ice transport tube at least every 2 ft 0 6 m to prevent dips or traps...

Page 16: ...ton PA 18040 USA Toll free 877 612 5086 1 610 252 7301 www follettice com Maestro Micro Chewblet Vision Harmony Ice Manager Horizon Horizon Elite are trademarks of Follett Products LLC Chewblet RIDE F...

Reviews: