Normal operation – Stage 1 - 230V 50 Hz
Power is supplied to L1 of the control board, the
POWER LED light begins flashing. The ice level bin thermostat in
the dispenser is closed and calling for ice, supplying contact closure to the control board. The
LOW BIN LED will
be on. The control board will now go through the start-up sequence. The board checks the water sensors (located
in the reservoir) for continuity between the common probe (B) and the high probe (C). If continuity is not sensed,
the water fill valve (P21) is energized.
5
2
1
Start
Run
Compressor
T.O.L.
MAINTENANCE
LOW WATER
TIME DELAY
SLEEP CYCLE
MAKING ICE
LOW BIN
POWER
SERVICE
HI AMPS
HI PRESSURE
DRAIN CLOG
CLEANER FULL
High
Pressure
Switch
R S
C
Gearmotor
Start
Relay
Start
Relay
N
L1
Fan
A B C D
Water Sensors
RESET
Fill
Valve
Drain
Valve
3
4
2
Bin T-Stat
Clean Switch
Drain Clog Sensor
P6
P21
P20
P19
P3
P22
P4
AUGER
WATER LEVELS
BIN P11
HI PRS
L1
R
S
C
RED
WHITE
WHITE
BLACK
BROWN
BLUE
RED
BLACK
YELLOW
Compressor
Electrical Box
COMPRESSOR
1 2 3 4 5 6 7 8
BLACK
N
P15
Ice Dispense Input
Normal operation – Stage 1 - 220 V 60 Hz
The 220 V 60 Hz is identical to the 230 V 50 Hz EXCEPT that the compressor output and neutral are reversed, as
shown in the diagram below. The remaining Stages show only the 230 V 50 Hz applications.
Start
Run
Compressor
MAINTENANCE
LOW WATER
TIME DELAY
SLEEP CYCLE
MAKING ICE
LOW BIN
POWER
SERVICE
HI AMPS
HI PRESSURE
DRAIN CLOG
CLEANER FULL
High
Pressure
Switch
R S
C
Gearmotor
Start
Relay
Start
Relay
N
L1
Fan
A B C D
Water Sensors
RESET
Fill
Valve
Drain
Valve
3
4
2
Bin T-Stat
Clean Switch
Drain Clog Sensor
P6
P21
P20
P19
P3
P22
P4
AUGER
WATER LEVELS
BIN P11
HI PRS
L1
RED
WHITE
WHITE
BLACK
BROWN
BLUE
RED
BLACK
YELLOW
Compressor
Electrical Box
COMPRESSOR
1 2 3 4 5 6 7 8
BLACK
N
P15
Ice Dispense Input
5
2
1
T.O.L.
R
S
C
18
MC_425A/W, MM_425A/W, MF_425A/W, _P425A/W Ice Machines