Pan
Tilt System
Users Manual, Rev. 1.0, May 2020
42
6 Operation
6.1 Switching On
Make sure that the system and other components of the installation are closed so that it is
impossible to come into contact with live parts.
Do not stay in the vicinity of the pan tilt head when it is powered. Act on the system only
in the absence of a power supply.
Make sure that all parts of the system are fastened down firmly and safely.
Note
The automatic pre-heating (De-Ice) process could be started whenever the device is switched on and the
ambient temperature is below 0°C (32°F). The procedure is necessary to guarantee correct operation of the
devices even at low temperatures. The duration ranges depending on environmental conditions (from
60 min. up to 120 min.).
The unit is switched on by connecting the power supply.
To switch off the unit disconnect the power.
Summary of Contents for Pan Tilt System
Page 5: ......
Page 21: ...Technical Data Dimensions 21 2 2 4 Dimensions Figure 2 2 Dimensions ...
Page 32: ...Pan Tilt System Users Manual Rev 1 0 May 2020 32 Fully assembled camera ...
Page 41: ...Pan Tilt Head Installation Fixing 41 5 Figure 5 10 Fixing of Upper Body and Base ...
Page 56: ...Pan Tilt System Users Manual Rev 1 0 May 2020 56 ...