8  TROUBLESHOOTING 

  

WARNING EXPLOSION HAZARD: DO 

NOT OPEN ENCLOSURE WHEN AN EXPLOSIVE 
ATMOSPHERE MAY BE PRESENT.  TURN OFF 
UNIT BY OPENING ALL FUSES PRIOR TO 
REPLACING BATTERY.

 

 

8.1  Loss of Communications 

Loss of communications with the repeater may occur 
for several reasons: 

 

Unit not powered up 

 

Unit out of range of receiver 

 

Receiver not configured correctly 

See solutions below to each of the possible causes: 
 

8.1.1  Unit Not Powered Up 

1.  Confirm that unit is powered up and 

receiving/transmitting data.  There are 4 LED 
lights on the repeater main board: 

a.  DECODE: indicates when a 

message is received from a 
transmitting unit (usually flickers 
often) 

b.  XMIT: indicates when the repeater is 

transmitting data 

c.  LO BAT: not used, remains off. 
d.  PWR: turned on when power is 

applied to the repeater. 

 

Figure 7: Repeater status lights 

 

If unit is powered up and 
receiving/transmitting data, proceed to next 
possible solution.  Otherwise, proceed to step 
2. 

2.  Verify battery and DC power supply/solar 

panel fuses are connected and not blown 
(see section  4  MAINTENANCE for how to 
turn on unit). 

3.  Use a voltmeter to read the battery voltage 

across the battery terminals.  If the voltage is 

below 11V, replace the battery according to 
instructions in section 4  MAINTENANCE. 

4.  Lastly, confirm the power source being used 

to charge the battery.  This procedure will 
vary depending on if your unit has a solar 
panel or AC power input. 

a.  AC Power: confirm the voltage 

coming out of the DC power supply is 
close to and above 12VDC.  If there 
is no output from the power supply, 
confirm that AC power is connected 
to the power supply.  If the AC power 
connection is working, the power 
supply will need to be replaced.  
Contact the Flowserve factory for 
assistance. 

b.  Solar Panel: confirm the power 

coming out of the power regulator is 
12VDC or higher.  If there is no 
output from the regulator, confirm 
that the solar panel is connected to 
the input and functional.  If the solar 
panel supply is working, the voltage 
regulator will need to be replaced.  
Contact the Flowserve factory for 
assistance. 

 

Figure 8: Measuring battery level on repeater 
using a voltmeter 

 

Summary of Contents for IPS Wireless

Page 1: ...Repeater Installation Operation Maintenance Wireless Data Repeating Unit PCN xxxxxxxxxxx 8 14 E Original Instructions These instructions must be read prior to installing operating using and maintaini...

Page 2: ...2 5 DISPOSAL INSTRUCTIONS 6 3 DESCRIPTION 6 3 1 OPTIONS AND MODEL NUMBERS 6 4 MAINTENANCE 6 4 1 TOOLS REQUIRED 6 4 2 TURNING UNIT ON OFF 6 4 3 BATTERY REPLACEMENT 7 4 4 PERIODIC MAINTENANCE 7 5 CUSTOM...

Page 3: ...sive Atmospheres ATEX Where applicable the Directives and any additional Approvals cover important safety aspects relating to machinery and equipment and the satisfactory provision of technical docume...

Page 4: ...WHEN AN EXPLOSIVE ATMOSPHERE MAY BE PRESENT WARNING STATIC HAZARD WIPE ONLY WITH A DAMP CLOTH DUE TO ELECTROSTATIC DISCHARGE HAZARD 1 6 2 Personnel qualification and training All personnel involved in...

Page 5: ...dering spare parts or further accessories 2 1 1 Unpacking Carefully open package received from factory and remove protective wrapping from Repeater and accessories Inspect all hardware for damage Repo...

Page 6: ...y transmits a status update to the appropriately configured IPS Wireless Receiver Data is received and transmitted on either the 900MHz or 868MHz spread spectrum frequencies frequency is pre configure...

Page 7: ...Ensure repeater powers up then close enclosure cover 8 Dispose of old battery in accordance with local laws and regulations 4 4 Periodic Maintenance The only field maintenance required for the repeate...

Page 8: ...should be installed in the penetration to allow the power wiring to enter the enclosure While penetrating the enclosure and installing the fittings take care not to damage the internal wiring and boar...

Page 9: ...provided black battery strap Close all fuses to power up the unit Figure 5 Solar powered repeater unit with battery wires shown disconnected in bottom left 6 6 Confirming Data Reception After the rep...

Page 10: ...tional Spares G1 0005 Replacement battery 12V 18Ah 1 G2 0002 Replacement solar panel 12V 10W 0 G2 0010 Pole mounting bracket for solar panel 0 H0 0129 Replacement Fuse 2 5A 250V Slo Blo 5x20mm Littlef...

Page 11: ...REPEATER ENGLISH 701 8001 01 08 14 Page 11 of 19 flowserve com 7 2 Drawings Figure 6 Sample wiring diagram for repeater...

Page 12: ...ed to step 2 2 Verify battery and DC power supply solar panel fuses are connected and not blown see section 4 MAINTENANCE for how to turn on unit 3 Use a voltmeter to read the battery voltage across t...

Page 13: ...a message is received from a transmitting unit usually flickers often b XMIT indicates when the repeater is transmitting data c LO BAT not used remains off d PWR turned on when power is applied to the...

Page 14: ...2 2 Unit out of range of transmitting units If communications from the transmitting units to repeater are still not successful physically move the repeater next to and with a clear line of sight to t...

Page 15: ...are provided with these instructions where applicable Examples are certificates for CE marking and ATEX marking etc If required copies of other certificates sent separately to the Purchaser should be...

Page 16: ...urement control and laboratory use EMC requirements Part 1 General Requirements EN 55011 2009 Industrial scientific and medical equipment Radio frequency disturbance characteristics Limits and methods...

Page 17: ...N 60079 11 EN 60079 26 2007 2007 Explosive atmospheres Part 11 Equip protection by intrinsic safety i Explosive Atmospheres Part 26 Equipment with equipment protection level ELP Ga EN 61241 0 2006 Ele...

Page 18: ...nstrate that the product meets the requirements of the Directives has been compiled by the signatory below and is available for inspection by the relevant enforcement authorities Signed ______________...

Page 19: ...rporation Pump 5215 North O Connor Blvd Suite 2300 Irving Texas 75039 5421 USA Telephone 1 972 443 6500 Europe Middle East Africa Flowserve Corporation Parallelweg 13 4878 AH Etten leur The Netherland...

Reviews: