>> Operation steps

 

·

 

Tighten the locknut into ball valve, adjust the insertion depth scale.

 

·

 

Open ball valve, completely push in the upstream transducer rod. Adjust the 
transmit direction parallel with pipe axis, and point to the

 

installation point of 

downstream transducer.

 

Lock it after adjustment.

 

·

 

Install downstream transducer in the same way. Adjust the transmit direction to 
get the best signal strength and watching Menu91, if the value is between 97% ~ 
103%, the installation  is

 

correct. If not, need to re - adjust the insertion depth and transmit direction until 
meet the requirement.

 

 

7. Check installation

 

Please see details in Chapter 7.5

 

 

7.4

 

In

-

line type transducer installation

 

After choosing the installation point, install the  transducer in the pipeline with companion 
flanges.

 

Then connect the transducer to converter with special signal cable. Installation is complete.

 

1) Installation method

 

 
 

>> Transmit directon

 

There is a indicatng arrow on the transducer junccon box, the arrow 
directon on two

 

transducers should be opposite and parallel to the pipe 

axis.

 

Page 20

Summary of Contents for WUF100 CF Series

Page 1: ......

Page 2: ...on of Ultrasonic ow meter Ultrasonic Flowmeter Converter Transducer Bracket 1 2 Types of Converters Items Separated Mount Wall mount WUF100 CF Fix Mount WUF100 IR 1 3 Types of Flow Temperature Transdu...

Page 3: ...3 Measuring Diagrams 3 1 Separated Mounting Clamp On Inline 3 2 Fixed Mounting Clamp On Inline 4 Converter Installation and Wiring Diagram 4 1 Separated Mounting WUF100 CF Dimention...

Page 4: ...rail mounting by using rail xing clamps DIN rail mounting by using PCB bracket Converter of WUF100 CF can be installed on the wall or in distribution box and explosion proof box Converter of WUF100 CF...

Page 5: ...WUF 100 CF Wiring Diagram Thickness 75mm Thickness 165mm Wall moun ng Fix the onverter Explosion proof grade D BT5 with 4 6 expansion bolts Fix the converter with 4 8 expansion bolts 4 2 Fix mounting...

Page 6: ...100 IR Wiring Diagram Open the back cover and complete the wiring To avoid leaking please tighten the water joint and screws of the back cover after wiring Be sure not to open the front cover 5 Displ...

Page 7: ...nu windows that are numbered by M00 M01 M02 M99 Method to enter Menu Press MENU rst and follow the two digit number keys Take M35 as an example the correct key sequence is MENU 3 5 To move between the...

Page 8: ...e ash memory so that these parameters will be solidi ed and will be loaded as the default parameters every time when power is turned on M27 To save the installation point parameter M28 Maintain the la...

Page 9: ...ontrol 1 If Send to RS485 is selected all the data produced by the data logger will be transmitted out through the RS 232 RS485 interface 2 If To the internal serial BUS is selected the data will be t...

Page 10: ...oper input source the OCT circuit will close when the trigger event occurs M79 Relay or OCT2 setup By selecting a proper input source the RELAY will close when the trigger event occurs M80 Window for...

Page 11: ...l energy totalizer multiplying factor Factory default is 1 M89 1 Display the temperature di erence 2 Window for entering the lowest temperature di erence M90 Display signal strengths S one for upstrea...

Page 12: ...convenience of eld working All the values are in single accuracy The calculator can be used while the ow meter is conducting ow measurement Water density and PT100 temperature can also be found in th...

Page 13: ...d to select the pipe material and then press ENT key 4 Press key to enter M16 window press ENT key to enter the option selection mode Use keys and to select the liner material and then press ENT key S...

Page 14: ...ultrasonic signal transmission and would decrease the inner diameter as well As a result the measurement accuracy can not be guaranteed Please try to avoid choosing the installation point with inside...

Page 15: ...verter Instrument well When measuring underground pipes or need to protect the measuring points an instrument well is required To ensure the enough installation space the sizes of instrument well shou...

Page 16: ...pipe axis and equal to the distance shown in the converter As shown A B are the two installation points Z method 1 Firstly according to the installation distance shown in converter positioning two poi...

Page 17: ...ase verify the parameters of pipeline and liquid To ensure the installation accuracy 1 Installation procedure Select an installation method Input the measuring parameters Positioning installation poin...

Page 18: ...space or the transducers can be only installed onthe top of pipeline parallel insertion transducer will be a good choice Pipe size 300 Positioning of parallel insertion transducer need to meet the 3 f...

Page 19: ...correct point If not need to positioning point B and C again As shown A B are the two installation points 4 Fix ball valve base Welding Fix For carbon steel pipes the ball valve base can be welded dir...

Page 20: ...ng the installation of ball valve and base insert the open hole tool into ball valve and lock it Then open the ball valve start drilling from slow to fast Close ball valve after drilling See more deta...

Page 21: ...value is between 97 103 the installation is correct If not need to re adjust the insertion depth and transmit direction until meet the requirement 7 Check installation Please see details in Chapter 7...

Page 22: ...ent Signal strength and Q value Installation Judgement 60 Can not work 60 75 Bad 75 80 Good 80 Excellent 2 Check transmission time ratio M91 is used for displaying transmission time ratio It is a perc...

Page 23: ...Page 22 Also Provide connectors level sensor level switch electromagnetic ow meter coriolis ow meter re pump test meter...