FlowCon FT.0.3 Installation And Operation Instruction Download Page 1

INSTALLATION AND OPERATION INSTRUCTION

1B95050 - P100006323 

Brasil 

Singapore 

                            .

03/2014

FlowCon International assumes no responsibility for mistakes, if any, in any printed material.

Denmark 

Dubai 

USA 

THERMAL ACTUATORS

FlowCon FT actuators

- 1 -

FlowCon FT.0.2, FT.0.3 and FT.0.4 actuators

360º

Figure 2

Figure 1

A 20625-00

FT.0.3

1403

Mad

ein

German

y

230 V NC 1,2 W

A 20625-00

FT.0.3

1403

Mad

ein

German

y

230 V NC 1,2 W

A 20625-00

FT.0.3

1403

Mad

ein

German

y

230 V NC 1,2 W

A 20625-00

FT.0.3

1403

Mad

ein

German

y

230 V NC 1,2 W

A 20625-00

FT.0.3

1403

Mad

ein

German

y

230 V NC 1,2 W

 >click<

The actuator type 

FlowCon FT.0.2

 is a thermal mo-

dulating actuator, NC. 

FlowCon FT.0.3

 and 

FT.0.4

 

are

thermal ON/OFF actuators, NC. 

Fitting the FlowCon FT actuator: 

Actuators are supplied with a separate black colored 

adaptor ring. First, screw on the adaptor ring finger 

tight to the connection thread at the top of the insert. 

Do not use additional tools (figure 1, 

 and 

). For 

FlowCon FT.0.2 connect the cable before fitting the 

actuator on to the adaptor ring. FlowCon FT.0.3 and 

FT.0.4 comes with fixed cable and can be fitted im-

mediately onto the adaptor ring (

). A click noise will 

indicate that the actuator is fitted correctly (

).

Removing the FlowCon FT actuator: 

Actuators are equipped with a front push button to 

activate the release mechanism. When pushed, the 

actuator is released and can be removed from the 

adaptor ring. A special feature on the FlowCon FT.0.2 

will allow the actuator to become tamper proof as the 

bush button can be removed for protection.

Installation of the FlowCon FT actuator: 

To ensure that the valve is in an open position during 

commissioning of the system, all mentioned actuators 

will be delivered in a Normally Open position and re-

main in this position until they are electrically operat-

ed first time. FIRST TIME POWERING requires ope- 

rating voltage applied for approximately 6 minutes.

Upside down installation is allowed for all FT-actua-

tors along with the standard horizontal and vertical 

installation (figure 2).

Reviews: