2
Thank you for purchasing your new greenhouse. We recommend you familiarize yourself with the instruc-
tions and read all safety information before you commence assembly.
The assembly instructions mainly consist of detailed illustrations and no specific technical knowledge is
required for the assembly of the greenhouse.
These instructions are divided into sections
:
Base, Side gable, Rear wall, Front wall, Roof, Vent, Door,
Louver, Polycarbonate or Glass, Fixing Spring clip or PVC capping bar, Down pipes, Anchoring green-
house to slab or base etc.
The house is packed in one carton and contains all of the parts and fittings. Package1(x2) mainly for side
gable parts, Package 2 for rear wall parts , Package 3 for front wall parts, Package 4 for roof parts, Pack-
age 5 for vent parts, Package 6 for door parts, Package 7 for Louver parts, Package 8 for down pipes
parts, fixing spring parts or PVC bars in other package. etc. All of the aluminum profiles are marked with a
part number corresponding to the numbers given on the drawings and in the separate parts list. Nuts, bolts
and fittings will be found in the relevant package.
The polycarbonate panel is packed in one carton, The sheets of Polycarbonate are not marked with a part
number, but the sizes appear in the overview. When fitting the Polycarbonate, the side with the opal film/
text must turn outward.
If include base, base is packed in another carton.
Safety Warning
1.
Aluminum profiles, polycarbonate and glass can potentially cause injury. Please ensure you wear pro-
tective goggles, gloves, headgear and suitable footwear when assembling and glazing the building.
2.
Please remember that glass is fragile and should be handled with extreme care. Always clear up and
dispose of any breakages immediately.
3.
Do not assemble the greenhouse in high winds.
4.
For safety reasons and ease of assembly, we recommend that this greenhouse is assembled by a
minimum of two people.
5.
The product you have purchased is intended only for the growing of plants and should only be used for
this purpose. When used for other purposes we will take no responsibility.
6.
When using a step ladder one person should steady it at all times whilst the other works.
7.
Should you encounter difficulties constructing this house, or in positioning the glass or polycarbonate
sheets, please contact your retailer–
do not use force!
8.
The greenhouse must always be anchored.
9.
In the event of high winds, close all doors and vents.
10. In the event of heavy snowfall, Please support the greenhouse roof and clear all lying
snow from the roof as it can cause the roof to buckle or collapse.
Site Preparation
1.
When selecting a site for your greenhouse, Always try to select a sunny location, it is vital that you
choose as flat and level an area as possible.
2.
Supplier's original base or a concrete or slab base will provide the most solid foundation for your
greenhouse.
3.
Do
not
fix your building down until the building is fully assembled, including glazing.
4.
Avoid placing your greenhouse under trees or in other vulnerable locations.
5.
To minimize the risk of wind damage, try to select as sheltered a site as possible, e.g. beside a hedge-
row or garden fence.
Statement