Contents for Step 1
(24) 1/2” Alum. Nylock Nuts
(2) 1/2 x 4” ss Bolts
(8) 1/2 x 3 1/2” ss Bolts
(6) 1/2 x 3” ss Bolts
(8) 1/2 x 1 3/4” ss Bolts
(48) 1/2” ID x 7/8” OD ss Washers
NOTE
(2) ½” Nuts and (2)
½” Washers are used
in Step 5-A to attach
lifting cables to (2)
½” x 4” Bolts
NOTE
ALL FASTENERS IN
STEP 1 ARE
HAND-
TIGHTENED ONLY.
Summary of Contents for V-3600
Page 2: ...Required Tools...
Page 8: ...1 E 1 D A B C D...
Page 9: ...IMPORTANT NOTE FRAME BEAMS MUST BE IN THIS ORIENTATION BEFORE CONTINUING FRONT REAR FRONT REAR...
Page 10: ...Contents for Step 2 4 1 2 Alum Nylock Nuts 4 1 2 x 3 3 4 ss Bolts Torque to 25 ft lbs...
Page 12: ...NOTE BUTT THE CORNER POST TAB UP TO THE FRAME BEAM CLAMP 2 A 2 C 2 B...
Page 15: ...Assembly of Step 3 3 A 3 D 3 B 3 C...
Page 16: ...3 E...
Page 17: ...Contents for Step 4 8 1 2 Alum Nuts 8 1 2 x 1 1 2 ss Bolts Torque to 45 ft lbs...
Page 19: ...4 C 4 D 4 E 4 F NOTE SURFACES MUST BE FLUSH 2x...
Page 20: ...4 H 4 I 4 J 4 G...
Page 22: ...Assembly of Step 5 5 C 5 A 5 B 5 D NOTE Recall 2 Nylock Nuts and 2 Washers from Step 1...
Page 23: ......
Page 25: ...V 2602 Frame Exploded View A LIFT P N 511 26080 00...
Page 26: ...V 2602 Frame Exploded View B LIFT P N 511 26080 00...
Page 27: ...V 2602Frame Exploded View C LIFT P N 511 26080 00...
Page 28: ......