background image

 

 

 

V-2602 Frame Exploded View B 

LIFT P/N 511-26080-00 

Summary of Contents for V-3600

Page 1: ...119 LIFT P N 511 26080 00 WITH PATENTED EASY LEVEL LEG SYSTEM ASSEMBLY INSTRUCTIONS Manufactured by Floe International Inc 48473 State Hwy 65 McGregor MN 55362 www floeintl com Instructions P N 611 26...

Page 2: ...Required Tools...

Page 3: ...CK 60 ft lbs 45 ft lbs 45 ft lbs 60 ft lbs 001 70218 00 001 76072 00 4 4 HHCS 1 2 13 x 3 3 4 ss 18 8 NUT 1 2 13 ALUMINUM NYLOCK 25 ft lbs 001 76071 00 001 70115 00 001 70117 00 8 4 4 NUT 3 8 16 ALUMIN...

Page 4: ...to C B to D to verify that the lift is square Measure distance between corner posts A to B B to C C to D A to D above frame beam and at the top of the corner post to verify that the lift is square Ens...

Page 5: ...Space Level work space Allow space to organize parts Material Blocking may be anything 10 15 in height 5 gallon bucket jack stands blocks saw horses QTY 4 2 for each side Purpose Blocking used to supp...

Page 6: ...x 4 ss Bolts 8 1 2 x 3 1 2 ss Bolts 6 1 2 x 3 ss Bolts 8 1 2 x 1 3 4 ss Bolts 48 1 2 ID x 7 8 OD ss Washers NOTE 2 Nuts and 2 Washers are used in Step 5 A to attach lifting cables to 2 x 4 Bolts NOTE...

Page 7: ...Assembly for Step 1 1 A 1 B 1 C A B C D NOTE 2 Nylock Nuts and 2 Washers ARE NOT used for 2 x 4 Bolts on corners A and D until Step 6 D...

Page 8: ...1 E 1 D A B C D...

Page 9: ...IMPORTANT NOTE FRAME BEAMS MUST BE IN THIS ORIENTATION BEFORE CONTINUING FRONT REAR FRONT REAR...

Page 10: ...Contents for Step 2 4 1 2 Alum Nylock Nuts 4 1 2 x 3 3 4 ss Bolts Torque to 25 ft lbs...

Page 11: ...Assembly of Step 2 NOTE CARRIDGE BOLT HEADS MUST FACE INSIDE OF LIFT NUTS MUST FACE OUTSIDE OF LIFT NOTE WATER DEPTH STICKERS MUST FACE OUT ON FRONT AND REAR OF LIFT...

Page 12: ...NOTE BUTT THE CORNER POST TAB UP TO THE FRAME BEAM CLAMP 2 A 2 C 2 B...

Page 13: ...2 D 2 E 2 F 2 G NOTE THIS TORQUE SPECIFICATION APPLIES TO THE 3 BOLT ABOVE 4 BOLT BOLTS ON POST A AND POST D ONLY...

Page 14: ...Contents for Step 3 4 3 8 x 3 1 2 SS Bolts Torque to 35 ft lbs 4 3 8 x 3 SS Bolts Torque to 35 ft lbs 8 3 8 Alum Nylock Nuts...

Page 15: ...Assembly of Step 3 3 A 3 D 3 B 3 C...

Page 16: ...3 E...

Page 17: ...Contents for Step 4 8 1 2 Alum Nuts 8 1 2 x 1 1 2 ss Bolts Torque to 45 ft lbs...

Page 18: ...Assembly of Step 4 4 A 4 B NOTE LIFTING CABLE IN UPWARD DIRECTION IS PLACED ON POST B AND POST C NOTE LIFTING CABLE IN DOWNWARD DIRECTION IS PLACED ON POST A AND POST D...

Page 19: ...4 C 4 D 4 E 4 F NOTE SURFACES MUST BE FLUSH 2x...

Page 20: ...4 H 4 I 4 J 4 G...

Page 21: ...Contents for Step 5 5 1 2 x 2 ss Bolts Torque to 45 ft lbs 5 1 2 Alum Nylock Nuts NOTE Recall 2 Nylock Nuts and 2 Washers from Step 1 Torque to 60 Ft Lbs...

Page 22: ...Assembly of Step 5 5 C 5 A 5 B 5 D NOTE Recall 2 Nylock Nuts and 2 Washers from Step 1...

Page 23: ......

Page 24: ...E 110 126 375 INCLUDES ITEMS 11 15 24 25 26 30 39 46 47 23 111 00000 00 4 SAND PAD WELDMENT 24 006 10202 00 4 PAD WEAR 1 2 x 7 8 x 2 64 111 00469 00 ASS Y END CRADLE 126 375 110 25 006 11001 00 4 UHMW...

Page 25: ...V 2602 Frame Exploded View A LIFT P N 511 26080 00...

Page 26: ...V 2602 Frame Exploded View B LIFT P N 511 26080 00...

Page 27: ...V 2602Frame Exploded View C LIFT P N 511 26080 00...

Page 28: ......

Reviews: