A
C
D
B
E
A
x8
E
4x4
1
2
A
E
A
E
C
x4
E
5x5
E
C
3
1
2
2
3
4
5
7
4
6
8
C
x4
E
5x5
C
E
4
Item No.: ET103
Installation guide
100KG
690-1170mm
1100-1800mm
2
32
mm/s
0
-40
°
C
C E F CC CUL
100
-
240
V
Technical data
Max. Weight
Capacity
Column Stage
Height Range
Width Range
Duty Cycle
10%, Max. 2 min on/ Min. 18 min off
Input Voltage
Max Speed
Temperature
Certification
Accessory list
Attention: The drawings below are only for reference which might be slightly
different from the actual object, please in kind prevail. Any tools missing or
installation problems,please contact the customer service firstly.
No.
Image
Spec
Qty
8
26
8
1
6
M6×16mm
Allen Key
4x4mm
Allen Key
5x5mm
ST4
.
2x20mm
M8×35mm
Adhesive Pad
Component list
7
1
8
1
3
1
4
2
1
2
2
2
5
2
6
1
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
Feet
Lifting Column
Side Bracket
Supporting Beam
Cable Management Tray
Hand Switch
Control Box
Power Plug
STEP 1
Place the feet(1) on the bottom of the lifting
column(2). Fix the feet using screws(A) with
Allen Key(E)
STEP 2
Insert the lifting columns into the ends of the
supporting beam(3). Fix the lifting columns
using screws(C) with the Allen Key(E).
STEP 3
Attach the side brackets(4) to the ends of
the supporting beam using screws(C) as
show with the Allen Key(E).