background image

A

C

D

B

E

A

x8

E

4x4

1

2

A

E

A

E

C

x4

E

5x5

E

C

3

1

2

2

3

4

5

7

4

6

8

C

x4

E

5x5

C

E

4

Item No.: ET103

Installation guide

100KG

690-1170mm

1100-1800mm

2

32

mm/s

0

-40

°

C

C E F CC CUL

100

-

240

V

Technical data

Max. Weight 

Capacity

 

Column Stage 

Height Range 

Width Range

Duty Cycle

10%, Max. 2 min on/ Min. 18 min off

Input Voltage 

Max Speed 

Temperature

Certification

Accessory list

Attention: The drawings below are only for reference which might be slightly 
different from the actual object, please in kind prevail. Any tools missing or 
installation problems,please contact the customer service firstly. 

No. 

Image 

Spec 

Qty 

8

26

8

1

6

M6×16mm

Allen Key
4x4mm

Allen Key
5x5mm

ST4

.

2x20mm

M8×35mm

Adhesive Pad

Component list

7

1

8

1

3

1

4

2

1

2

2

2

5

2

6

1

No.

Part

Qty No.

Part

Qty

No.

Part

Qty No.

Part

Qty

No.

Part

Qty No.

Part

Qty

No.

Part

Qty No.

Part

Qty

Feet

Lifting Column

Side Bracket

Supporting Beam

Cable Management Tray

Hand Switch

Control Box

Power Plug

STEP 1

Place the feet(1) on the bottom of the lifting 
column(2). Fix the feet using screws(A) with 
Allen Key(E)

STEP 2

Insert the lifting columns into the ends of the  
supporting beam(3). Fix the lifting columns 
using screws(C) with the Allen Key(E).

STEP 3

Attach the side brackets(4) to the ends of 
the supporting beam using screws(C) as 
show with the Allen Key(E).

Reviews: