
Servicing
8.4 Removing coupling part 1 (1) or 3 (3)
50
Edition 09/2022
M3602-01en
DANGER
Danger as a result of improper handling of fixtures and pumps
Failure to handle fixtures and pumps properly can result in injuries and cause the coupling
to burst. There is a risk of fatal injury from flying fragments. Bursting of the coupling can
lead to an explosion in potentially explosive atmospheres.
•
Please observe the manufacturer's information on handling the following tools:
ð
Pulling fixtures
ð
Pumps
WARNING
Risk of injury as a result of coupling components or the pulling fixture working
loose
Coupling components or pulling fixtures can work loose and fall when dismantling work is
in progress.
•
Use suitable hoisting gear to hold the coupling part 1 (1) or 3 (3) and the pulling fixture
in position.
•
Attach an axial locking element if the pressurised oil interference fit is tapered.
NOTICE
Risk of injury and danger to the environment from escaping oil.
•
Catch any oil which escapes.
•
Dispose of the oil according to the valid regulations.
Tools required
• One oil pump with pressure gauge (at least 2500 bar) per oil channel.
Or:
One motor-driven oil pump. One connection that can be closed independently is required
for each oil channel.
Refer to the dimension drawing for the number of oil channels.
• With a stepped bore:
A motor-driven oil pump at the oil channel located at the point of transition from the smal-
ler to the larger bore. A large quantity of oil per unit of time is needed here.
• Suitable connections and pipes.
• Suitable pulling fixture.
Or:
Retaining plate with retaining screws or threaded spindles with nuts. Material of the
screws and spindles must have at least strength class 10.9; material of the nuts depend-
ing on the material of the screws or spindles.
• Hydraulic cylinder with oil pump. Note displacement and pressure of the hydraulic cylin-
der. Refer to the dimension drawing for the required axial force.
Procedure
1. Move the coupled machines apart.
Summary of Contents for RUPER RBS
Page 1: ...RWB RBS Assembly and operating instructions M3602 01en Edition 09 2022 RUPEX...
Page 6: ...Table of contents 6 Edition 09 2022 M3602 01en...
Page 8: ...List of tables 8 Edition 09 2022 M3602 01en...
Page 10: ...List of figures 10 Edition 09 2022 M3602 01en...
Page 14: ...Introduction 1 4 Copyright 14 Edition 09 2022 M3602 01en...
Page 36: ...Commissioning 36 Edition 09 2022 M3602 01en...
Page 42: ...Operation 7 2 Faults causes and rectification 42 Edition 09 2022 M3602 01en...
Page 52: ...Servicing 8 4 Removing coupling part 1 1 or 3 3 52 Edition 09 2022 M3602 01en...
Page 54: ...Service and support 9 1 Contact 54 Edition 09 2022 M3602 01en...
Page 56: ...Disposal 56 Edition 09 2022 M3602 01en...
Page 62: ...Spare parts 11 2 Spare parts drawing and spare parts list 62 Edition 09 2022 M3602 01en...
Page 76: ...Declaration of Conformity EU Declaration of Conformity 76 Edition 09 2022 M3602 01en...
Page 77: ......