
Help: 888-426-5001
QualityWaterForLess.com
3) Before filling the tank, place a piece of painter’s
tape over the top of the riser tube to prevent
resin from dropping down inside as shown in
Figure 7-a.
i
avoid using duct tape which
leaves behind unwanted residue
4) Place the included filling funnel over the top of
the tank as shown in
Figure 7-B
and prepare to
fill the tank. If your softener system came with
gravel
, please pour this into the tank
first
, then
pour in the included resin media afterwards
F I G u R e 7- a
F I G u R e 7- B
3 ›I n s ta l l I n G t H e F l eC k 5 6 0 0 sx t Va lV e
1)
Using caution not to lift the riser tube,
remove the filling funnel and tape.
While
using the included silicone lubricant packet, lu-
bricate the inner and outer o-rings on the bottom
of the Fleck 5600 SXT Meter Valve as shown in
Figures 7-C and 7-D
2) Next, install the
t
op screen (standard or fine
mesh)
to the bottom of the Fleck 5600 SXT Meter
Valve as seen in Figure 7-E and then place the
valve onto the top of the tank, being sure that the
riser tube fits into the central o-ring on the valve,
as shown in Figure 7-F.
Hand-tighten
the valve to
the tank.
do not use Teflon tape or pipe dope
on the valve or tank threading
F I G u R e 7- C
F I G u R e 7- e
F I G u R e 7- d
F I G u R e 7- F
s ta n d a R d
F I n e m e s H