Assembly
AP BIO
400/500/1000/2400
18
FG-DC_10523-GB_AP Bio_IOM-R0-12/2020 • Subject to modifications
6
Assembly
6.1
Erecting the unit
The unit must be installed at a location that fulfills the following requirements:
– Ensure that the ground are level and that it can support the weight of the equipment,
so that no vibrations or operating noises occur when the unit is operating.
– The unit must be installed in such a way that it is only accessible to trained and
authorized technical personnel. If required, use appropriate equipment to keep
unauthorized persons away from the unit.
– To achieve the best performance of the AP BIO air purifier it is desirable to position
the unit as close to the center of the room as possible. Make sure that the indoor air
inlets at the top of the unit are not blocked, otherwise operation, performance and
noise levels will be affected.
– Roll the unit to the desired position and apply the brake on the front casters
(AP BIO 2400 and AP BIO 1000).
– Connect the power supply. If necessary, use an extension cord compatible with the
electrical power of the unit (see identification plate).
Note on mounting and installing the unit!
Here you will find information on how to mount and install the unit.
Placement, installation and assembly may only be carried out by qualified
specialists with proper professional training and experience in the relevant
accident prevention regulations, as well as other generally recognized safety and
occupational health codes.
Note on moving the unit!
If the FläktGroup units have been moved from one plant/location to another,
repeated commissioning is required.
Notice!
Use only the supplied order-related documentation and enclosed detailed
dimensional drawings when transporting the unit.